Showing posts sorted by date for query Space Force launch lane. Sort by relevance Show all posts
Showing posts sorted by date for query Space Force launch lane. Sort by relevance Show all posts

Thursday, May 8, 2025

Rocket Lab's Neutron awarded US Military contract

Rocket Lab's heavier lift platform, Neutron, is under development so it's fitting that the Neutron has been picked for a US Air Force mission that's also under development.  

The mission, slated for no earlier than 2026, will fall under the Air Force Research Laboratory’s (AFRL) “rocket cargo” program, which explores how commercial launch vehicles might one day deliver materiel to any point on Earth within hours—a vision akin to airlift logistics via spaceflight.

Rocket Lab announced the award May 8. The contract’s value was not disclosed.

Rocket Lab's founder and CEO, Peter Beck, noted the contract award during a first quarter earnings call, and described it this way:

“That program is really at the very beginning of its development within the U.S. government,” Beck said. “So I think we’re very much in the experimental phase. And it’ll be interesting to see if that turns into a full requirement for an operational capability.”

This selection by the US Air Force follows what Beck called "the big news in the first quarter" - that Rocket Lab had been picked to compete for national security launch contracts.  

The Space Systems Command announced on March 27 that Rocket Lab and Stoke Space will be eligible to compete against established players Blue Origin, SpaceX, and United Launch Alliance (ULA) in the National Security Space Launch (NSSL) Phase 3 Lane 1 program. This indefinite-delivery/indefinite-quantity contract structure allows the selected companies to bid on launch service orders through 2029, with at least 30 missions expected to be awarded – totaling an estimated $5.6 billion in task orders.

That's quite a group of companies to be included with - and they've earned their place.  It was under 11 months ago that their Electron light-lift rocket became the first commercially developed rocket to reach 50 launches.  Plus, almost exactly two years ago, they announced their the Hypersonic Accelerator Suborbital Test Electron (HASTE) program that has already completed several missions for the US Space Force.

Illustration of Rocket Lab's Neutron cargo delivery payload.  Image credit: Rocket Lab

Neutron, designed to lift up to 13,000 kg to low Earth orbit, remains on schedule for its inaugural launch in 2025, Beck said. The company reports that both launch pad construction at Wallops Island, Virginia, and rocket development continue to progress as planned.



Monday, April 7, 2025

Space Force Announces Another Round of Launch Contracts

On Friday, April 4, the US Space Force announced a new $13.7 billion round of launch contracts to put their “most critical” payloads into orbit into the 2030s.  

Unsurprisingly, the contract breakdown is like this:

  • SpaceX will get 28 missions worth approximately $5.9 billion
  • ULA will get 19 missions worth approximately $5.4 billion
  • Blue Origin will get seven missions worth approximately $2.3 billion

As usual, a little more detail adds some clarity. 

Rounded to the nearest million, the contract with SpaceX averages out to $212 million per launch. For ULA, it's $282 million, and Blue Origin's price is $341 million per launch. But take these numbers with caution. The contracts include a lot of bells and whistles, pricing them higher than what a commercial customer might pay. 

Ranking by percentage of missions awarded, SpaceX is the clear winner at 52% of the contract and they're also the lowest cost launch provider.  When you consider that ULA's Vulcan rocket just got certified to fly those missions and Space Force has said a couple of times that ULA's pace is too slow for them, their getting 35% of the launches seems a bit optimistic.  Blue Origin at seven launches might be even more so.

After racking up a series of successful launches with its Falcon 9 rocket more than a decade ago, SpaceX sued the Air Force for the right to compete with ULA for the military's most lucrative launch contracts. The Air Force relented in 2015 and allowed SpaceX to bid. Since then, SpaceX has won more than 40 percent of missions the Pentagon has ordered through the National Security Space Launch (NSSL) program, creating a relatively stable duopoly for the military's launch needs.

The Space Force took over the responsibility for launch procurement from the Air Force after its creation in 2019. The next year, the Space Force signed another set of contracts with ULA and SpaceX for missions the military would order from 2020 through 2024. ULA's new Vulcan rocket initially won 60 percent of these missions—known as NSSL Phase 2—but the Space Force reallocated a handful of launches to SpaceX after ULA encountered delays with Vulcan.

Regular readers might remember a few posts about Space Force launch contracts talking about phases and lanes and that whole thing is still too arcane for me to be comfortable with.  About all I feel comfortable saying is that "Lane 1" is higher risk and tends to go to newer launch vehicles for lower orbits and easier paths to get there. 

Friday's announcement covers Lane 2 for traditional military satellites that operate thousands of miles above the Earth. This bucket includes things like GPS navigation satellites, NRO surveillance and eavesdropping platforms, and strategic communications satellites built to survive a nuclear war. The Space Force has a low tolerance for failure with these missions. Therefore, the military requires rockets to be certified before they can launch big-ticket satellites, each of which often costs hundreds of millions, and sometimes billions, of dollars.

The Space Force required all Lane 2 bidders to show their rockets could reach nine "reference orbits" with payloads of a specified mass. Some of the orbits are difficult to reach, requiring technology that only SpaceX and ULA have demonstrated in the United States. Blue Origin plans to do so on a future flight.

The military expects to order 54 launches in Lane 2 from this year through 2029, with announcements each October of exactly which missions will go to each launch provider.  This year, it will be just SpaceX and ULA. The Space Force said Blue Origin won't be eligible for firm orders until next year. 

This image shows what the Space Force's fleet of missile warning and missile tracking satellites might look like in 2030, with a mix of platforms in geosynchronous orbit, medium-Earth orbit, and low-Earth orbit. The higher orbits will require launches by "Lane 2" providers. Credit: Space Systems Command

"A robust and resilient space launch architecture is the foundation of both our economic prosperity and our national security," said US Space Force Chief of Space Operations Gen. Chance Saltzman. "National Security Space Launch isn't just a program; it's a strategic necessity that delivers the critical space capabilities our warfighters depend on to fight and win."



Saturday, February 1, 2025

Small Space News Story Roundup 52

Largely from this week's Rocket Report from Ars Technica, but not only from there.

Space Force Has Big Dreams For 2025

The main emphasis in this section was launches on ULA's Vulcan, but it's not just Vulcan. The US Space Force is projecting 11 national security launches aboard the Vulcan rocket in 2025.  That's an aggressive schedule considering that Vulcan isn't certified for national security payloads yet.  

While ULA aims to ramp up Vulcan flights for military missions, SpaceX has maintained its dominance in the commercial launch market and even absorbed additional national security launches in 2024 that were originally slated for Vulcan, highlighting the Space Force’s growing reliance on SpaceX’s proven Falcon rockets to maintain critical military space access.

Add New Glenn to the mix.  The first mission of the New Glenn in January was deemed a success by the Space Force and it seems Blue Origin is going to do a second qualifying launch by the spring.  Space Force doesn't appear to be concerned about Blue's inability to land the booster for recycling and re-use.  Brigadier General Kristin Panzenhagen emphasized that booster recovery isn't a criterion for NSSL eligibility.  

“For our national security space launch missions, the primary measure of success is delivering the payload to its destination,” she said. 
 
The flight positions New Glenn to compete for Lane 1 of the NSSL Phase 3 program, which covers less complex missions. A second successful flight will likely be required for the rocket to qualify for the more demanding Lane 2 missions.

Blue Origin’s path to certification remains proprietary, with the company given the option to balance demonstration launches and detailed data reviews to meet Space Force requirements. ULA publicly disclosed that its plan to certify Vulcan would require two successful flights.

Vulcan is still under pressure with certification expected in late February.  If Space Force gets 11 NSSL launches out of the 10 months left in the year ULA is going to have operate at a pace we haven't seen them meet in years - if ever. 

Sorry, but this story makes me laugh

It's actually a headline in the Rocket Report that SpaceX expended a Falcon 9 this past Wednesday, Jan. 29.  You know, like virtually every other launch by every other launch service in the world, they used up every pound of payload to orbit they could get out of this system before letting it crash into the Atlantic ocean. That included taking steps like removing the landing legs and grid fins to add those few pounds to the payload it could put in orbit.  

The payload was the SpainSat NG-1 satellite launched from Kennedy Space Center's Pad 39A. 

The gigantic difference between SpaceX expending booster B1073 and every other example you can think of is that this was the 21st flight of B1073.  I'm unaware of any other launch provider that currently is able to recover and re-fly boosters over 20 times.

The Airbus-built satellite, known as SpainSat NG-1 (New Generation), is the first of two satellites for Hisdesat. It was developed under a partnership with the European Space Agency, making its launch on a Falcon 9 somewhat notable.

Apparently, the FAA is still being the FAA

Apparently enough people think that the FAA is just going to let SpaceX operate without doing their usual process on Starship's Flight Test 7 that it's news the FAA is going to follow FAA policies.

Within hours of the Starship's RUD, people were reporting finding debris, although there were no reports of any serious damages. 

The good news is there were no injuries or reports of significant damage from the wreckage that fell over the Turks and Caicos. "The FAA confirmed one report of minor damage to a vehicle located in South Caicos," an FAA spokesperson told Ars on Friday. "To date, there are no other reports of damage."

It's not clear if the vehicle owner in South Caicos will file a claim against SpaceX for the damage. It would the first time someone makes such a claim related to an accident with a commercial rocket overseen by the FAA. Last year, a Florida homeowner submitted a claim to NASA for damage to his house from a piece of debris that fell from the International Space Station.

A piece of what appears to be heat shield tile recovered in the Caicos, as shown on X. 



Monday, October 21, 2024

SpaceX Dominates ULA in latest Space Force Bidding

The US Space Force's Space Systems Command announced Friday that in their latest contract competition, it has ordered all nine launches from SpaceX.  This was in the bidding competition for the first batch of dozens of missions the military will buy in the next phase of national security launch contracts.

The nine launches are divided into two fixed-price "task orders" that Space Systems Command opened up for bids earlier this year.  One task order is for seven launches of missile tracking and data relay satellites for the Space Development Agency's constellation. The other is for two launches for the National Reconnaissance Office, the US government's spy satellite organization. SpaceX won both task orders for a combined value of $733.5 million. 

The only two companies invited to bid on the contract were SpaceX and the United Launch Alliance. 

The contracts they're reporting on appear to be the ones mentioned this June in that they use the same terminology of Phase and Lane. 

This is the Space Force's first firm order for rocket launches in the so-called Phase 3 round of launch procurements. The Space Force has divided 79 missions for competition in the Phase 3 procurement into two classifications: Lane 1 and Lane 2.

The task orders announced Friday are the first awarded in Phase 3 Lane 1, which is for less demanding launch profiles into low-Earth orbit.

"We are excited to kick off our innovative NSSL Phase 3 Lane 1 effort with two task orders that support critical NRO and SDA missions," said Lt. Col. Douglas Downs, Space Systems Command's material leader for space launch procurement. "Industry stepped up to the plate and delivered on this competition."

While the USSF has mentioned several more possible competitors for these Lane 1 launches, including Blue Origin's New Glenn, military officials require a rocket to complete at least one successful orbital launch to become qualified for a Lane 1 task order and New Glenn hasn't flown. While Vulcan has carried out two successful orbital test flights - they don't have the full certification for all USSF launches yet. That certification will be a requirement for the coming Lane 2 missions, which are going to be more challenging military missions, typically larger, more expensive payloads destined for higher orbits. 

The Space Force is expected to soon select launch providers for Lane 2 missions. These launches will require the Space Force to certify the rockets, whereas the military is comfortable accepting a little more risk for the Lane 1 missions.

SpaceX's Falcon 9 and Falcon Heavy are currently certified for national security launches. 

File photo of a Falcon 9 launch from Vandenberg Space Force Base, SLC-4E. Image credit: SpaceX



Friday, June 14, 2024

US Space Force Opens a New Round of Bidding for Launch Contracts

By itself, it's not really headline news that the US Space Force is announcing another round of launch contracts is open to be bid on. Yeah, it's not constant stuff that they do every day, but it's still done fairly often. The news here is the contractors being considered.  In particular, Blue Origin and their still never-flown New Glenn. 

The US Space Force announced Thursday that Blue Origin will compete with United Launch Alliance and SpaceX for at least 30 military launch contracts over the next five years. These launch contracts have a combined value of up to $5.6 billion.

This is the first of two major contract decisions the Space Force will make this year as the military seeks to foster more competition among its roster of launch providers, and reduce its reliance on just one or two companies.

For over a decade after the formation of United Launch Alliance from Boeing and Lockheed Martin, ULA was the pentagon's sole launch provider. In 2018, SpaceX started launching military payloads for the military. 

The approach for this new round of contracts, known as NSSL Phase 3, is different from the way the military previously bought launch services. Instead of grouping all national security launches into one monolithic contract, the Space Force is dividing them into two classifications: Lane 1 and Lane 2. 

The concept is that Lane 1 is smaller payloads to LEO. These launches will include smaller tech demos, experiments, and launches for the military’s new constellation of missile tracking and data relay satellites. While small satellites, this could eventually include hundreds or thousands of spacecraft managed by the Pentagon’s Space Development Agency. Lane 2 is for bigger payloads.

This fall, the Space Force will award up to three contracts for Lane 2, which covers the government's most sensitive national security satellites, which require "complex security and integration requirements." These are often large, heavy spacecraft weighing many tons and sometimes needing to go to orbits thousands of miles from Earth. The Space Force will require Lane 2 contractors to go through a more extensive certification process than required in Lane 1.

“Today marks the beginning of this innovative, dual-lane approach to launch service acquisition, whereby Lane 1 serves our commercial-like missions that can accept more risk and Lane 2 provides our traditional, full mission assurance for the most stressing heavy-lift launches of our most risk-averse missions," said Frank Calvelli, assistant secretary of the Air Force for space acquisition and integration.

The bidders also had to substantiate their plan to launch the rocket they proposed to use for Lane 1 missions by December 15 of this year. The selections are the two you'd expect - SpaceX Falcon Heavy (and Falcon 9 where it can lift the payload), along with ULA's new Vulcan - plus Blue Origin's New Glenn. The Vulcan has flown successfully once and may have its Cert-2 (certification) flight "No Earlier Than" this September. New Glenn has never flown but Blue Origin has also listed its first flight, which I'm assuming is their Cert-1 mission, as NET September. 

“As we anticipated, the pool of awardees is small this year because many companies are still maturing their launch capabilities,” said Brig. Gen. Kristin Panzenhagen, program executive officer for the Space Force's assured access to space division. “Our strategy accounted for this by allowing on-ramp opportunities every year, and we expect increasing competition and diversity as new providers and systems complete development."

The Space Force plans to open up the first on-ramp opportunity for Lane 1 as soon as the end of this year. Companies with medium-lift rockets in earlier stages of development, such as Rocket Lab, Relativity Space, Firefly Aerospace, and Stoke Space, will have the chance to join ULA, SpaceX, and Blue Origin in the Lane 1 pool at that time. The structure of the NSSL Phase 3 contracts allow the Pentagon to take advantage of emerging launch capabilities as soon as they become available, according to Calvelli.

First New Glenn on the pad at Launch Complex 36 for testing earlier this year. Image credit: Blue Origin.

I was a bit confused by the language of saying Lane 1 was for smaller, LEO satellites and other small payloads, then putting Falcon Heavy, Vulcan and New Glenn in Lane 1 when they clearly seem to be the ones necessary for Lane 2, but perhaps that means they become Lane 2 when it becomes real, and can also do Lane 1 missions, but Lane 1 contractors can't do Lane 2. Or something. 



Wednesday, November 29, 2023

Firefly Runs First Test of Antares Replacement Engine

I've mentioned a few times around here (like here) that Northrop Grumman's booster, called Antares, has gone obsolete and will be unable to fly anymore.  This is the rocket that carried their Cygnus cargo vessel to the ISS.  The booster went obsolete because it relied on Russian engines just like the Atlas V.  The solution is that they're going to replace the Antares with a new launch vehicle called the Antares 330, which is being developed by Firefly Aerospace. 

Yesterday, we learned that Firefly had done the first test firing of the new engine that's going to be the power behind Antares 330, the Miranda.  The Miranda is also going to power Firefly's own Medium Lift Vehicle, or MLV.  

Firefly announced Nov. 28 that it conducted the test of its Miranda engine at the company’s Texas test site. A company spokesperson said the test, performed at 65% power, was designed to validate the engine’s startup sequence.

The company plans to work its way up to a full-duration test in the coming months, running the engine for 206 seconds. Miranda uses liquid oxygen and kerosene propellants, generating 230,000 pounds-force of thrust.

Firefly Aerospace's Miranda rocket engine hot fire test (Credit Firefly Aerospace) 

You probably know the kerosene propellant by the more common name of RP-1 (Rocket Propellant 1).  The combination of LOX and RP-1 is what powers the Merlin-1 engines of the Falcon 9.  In both vehicles, the engine is ignited by TEA and TEB (triethylaluminium-triethylborane) which produces the quick green flash captured in the photo above. I've seen occasional glimpses of that green flash at ignition of Falcon 9 launches.

The MLV (and Antares 330) will utilize 7 Miranda engines on the first stage and will be capable of producing 1.6 million pounds of thrust and the ability to deliver up to 10,000 kg of payload to the International Space Station on the Antares 330.

The MLV will be capable of sending up to 16,000 kg low Earth orbit as it will utilize the Miranda vacuum engine whereas the Antares 330 will use a Castor 30XL solid-fueled rocket motor for its first launches before an eventual transition to the Miranda vacuum engine.

In an interview earlier this month, Bill Weber, CEO of Firefly, said the schedule for the first MLV launch was driven by having the vehicle eligible for the National Security Space Launch (NSSL) Phase Three program in time to on-ramp to that program’s “lane one” for emerging launch vehicles. “We want to fly that mission in late ’25 so that we put ourselves in a position to qualify for the ’26 manifests in lane one,” he said. “So far, so good. We’re on track.” 

Weber went on to say:

“The incredible progress on our Miranda engines – designed, built, and tested in-house in just over a year – is another example of Firefly setting a new standard in the industry, building on the legacy of Firefly’s rapidly developed Reaver and Lightning engines, Miranda is the fastest propulsion system we’ve built and tested to date. This achievement reflects our rapid, iterative culture and our vertically integrated approach that allows us to quickly scale up the flight-proven engine architecture from our small launch vehicle, Alpha, to our Medium Launch Vehicle.”



Wednesday, April 12, 2023

Relativity to Move On to Terran R

Those who watched the Terran-1 first flight that never made it to orbit, the "successful failure," have witnessed the only flight of Terran-1 there will ever be.   

Relativity Space has announced they are proceeding into development of the larger Terran-R, and they're saying it's going to be bigger than they talked about before.  

(I clipped off the time tag, but Twitter says it was posted at 10:20 AM Wednesday - I assume EDT)

Of course, there's that tiny, minor matter of the failure that kept the second stage from firing properly and the first mission from making orbit.  CEO Tim Ellis says that they're not done with their failure analysis but their understanding is improving.  

(W)hen the Aeon engine's main valves were commanded to open, they opened slower than expected. There was also a problem with the oxygen pump, likely due to a "vapor bubble" at its inlet. As a result of all this, the engine's gas generator did not light, and the engine never reached full power.

The second stage would continue to climb along its (now) free-parabolic trajectory, reaching a max height of 134 km before falling back into the Atlantic.  On the whole, though, the company feels good about their first attempt.  After all, they did better than some other companies have done on their first flight, and among their most important goals was to demonstrate the 3D printed rocket could handle all the stresses it would be expected to, which it clearly did.  

So Relativity is dropping any work on the smaller vehicle and moving to the Terran R. Not only that, but they're increasing the size and payload capacity of the Terran R compared to earlier specs.  

  • The first stage will be fully reusable with a rated life of 20 missions.  The second stage will be expendable "for now." 
  • It will be capable of 23.5 metric tons to low-Earth orbit. Additionally, an expendable version of the Terran R rocket will carry 33.5 metric tons to low-Earth orbit. The Falcon 9 is rated for 22.8 metric tons to LEO, but in both cases, the actual payloads depend on the desired orbit.  One number doesn't fit all. 
    • Falcon Heavy is rated 63.8 metric tons to LEO. 
  • Terran R will be powered by 13 Aeon engines. This corresponds to 3.35 million pounds of thrust. This puts it solidly between Blue Origin's New Glenn rocket, which has 3.85 million pounds, and the version of United Launch Alliance's Vulcan rocket with four strap-on, solid rocket boosters at 3.1 million pounds of thrust.
  • Relativity is dropping the idea of additively manufacturing the entire Terran R rocket. Ellis said the Terran R will still be a "3D printed rocket," but initial versions (at least) will use aluminum alloy straight-section barrels, in response to "overwhelming market demand" for a vehicle of this size.  
  • First stage reuse plans look like SpaceX.  The returning boosters will combine grid fins and using different numbers of engines at different times during the return arc.  They'll land on a drone ship off the SE US coast and be refurbished at facilities on Cape Canaveral.

This is a major undertaking and while Relativity looks to be well-positioned for it, there's no guarantee, of course.  Relativity has more than $1.3 billion in fundraising, a large factory in Southern California, an engine test site at Stennis Space Center in Mississippi, and facilities at Cape Canaveral Space Force Station.  It has a staff of about 1,000 people.  In addition, they have a customer backlog of $1.65 billion in launch service agreements and an additional $3.68 billion in the customer pipeline.    

The negative side of this is delaying the first launch of the new Terran R to 2026, from the aspirational date of 2024 they've talked about before.

It's impressive to me that a company as young as Relativity Space can be credibly recognized as likely to accomplish this.  NASA and commercial satellite customers have voiced wanting a second company to step forward and challenge SpaceX on innovation, price, and reliability.  Tim Ellis correctly sees that this lane remains open with questions about Vulcan's long-term future, Blue Origin's slow movement on New Glenn, and Rocket Lab's focus on a smaller medium-lift rocket, Neutron.

Relativity graphic showing the features of Terran.



Friday, March 10, 2023

Weekly Small Space News Story Roundup 3

Arianespace chief plans on rapid Ariane 6 ramp-up

Arianespace had a rough time in 2022. Among the issues they dealt with were the sudden loss of cooperation with Russia for launches via the Soyuz vehicle, the December Vega C launch failure when the second stage failed, dooming the mission, and further delays in readying the Ariane 6 rocket for launch. In a paywalled op-ed published in the French publication Les Echos, Arianespace President Stéphane Israël defended the European launch company saying it would be wrong to criticize them. 

That's a lot to ask ... Rather, he argues that better times are coming for the European launch industry, noting in particular that the Ariane 6 vehicle had won a "historic" contract for 18 of Amazon's Project Kuiper satellite launches. To meet this demand, he says, Arianespace plans to be launching a dozen Ariane 6 rockets a year by 2025. This ramp-up is "essential" Israël said. It may indeed be essential, but launching an Ariane 6 rocket a month in 2025, with the booster unlikely to make its debut before early 2024, seems almost like magical thinking.

What's all this NSSL Phase 3 stuff, anyway?

A gold rush.  

The US military recently released a rather mundane-sounding document titled "National Security Space Launch Phase 3 DRAFT Request for Proposals #1." That may be a mouthful of jargon, but it's still a rather consequential document. Effectively, its release is the starting gun for the next round of launch contracts for US spy satellites, secure communications satellites, and more.

The US military issues these requests for proposals from time to time.  Proposals for launch contracts worth billions of dollars—substantially more than $10 billion—as the military seeks to secure launch deals for the late 2020s and early 2030s.  

The bottom line could be that they're finally getting serious about commercial space.  

In 2012, after SpaceX had already successfully flown the Falcon 9 four times, the military nonetheless awarded a block-buy contract exclusively to United Launch Alliance. Commercial launch startup be damned, the Department of Defense stuck with its monopoly.

As the Falcon 9 continued to fly, with prices substantially undercutting United Launch Alliance, this decision came to look pretty silly. So a few years later, the program was modified to allow SpaceX to win a few of these military contracts.

 Blue Origin and Northrup Grumman were told "thanks for playing; try again later." 

The Phase 3 contract is subdivided into subcategories such as Lanes 1, 2 and more.  Lane 1 is for smaller, less critical payloads.

... about 30 "Lane 1" missions will be awarded during a five-year period from fiscal year 2025 to 2029. These satellites will mostly fly into low-Earth orbit, and the missions are more "risk tolerant," meaning that if the rocket blows up and the satellite is lost, it will not have a hugely adverse effect on the military's operations.
...

The goal is to provide an opportunity for companies developing new medium-lift rockets to enter the competition. This includes Rocket Lab (with its Neutron rocket), Relativity Space (with its Terran R vehicle), and ABL Space (which has not named or announced a vehicle), Pentecost said. Companies with larger launch vehicles, like United Launch Alliance, SpaceX, and Blue Origin, are also eligible to compete in Lane 1. There likely will be many potential providers. Pentecost said 27 companies signed up for an "industry day" on February 28 to discuss this opportunity.

Lane 2 is the more traditional procurement strategy. About 40 missions will be awarded during a five-year period beginning in 2025. These are payloads that require the greatest capabilities from launch providers: the ability to deal with difficult orbits, secure rooms for pre-launch processing, and heavier lift capabilities.  Space Systems Command will select only two companies for this lane, which will split the mission awards in a 60-40 ratio; the way the current split between ULA (60) and SpaceX is currently built.  

There are lots of interesting side aspects to this and anyone interested should read the whole thing.  For one, the launch systems don't have to actually have been certified to any required "reference orbits" or not even actually flying.  They simply need to have agreed to complete the certification processes before they're eligible to fly those national security payloads.  That leaves room for companies like Blue Origin.  Space Systems Command expects to issue a "final" request for proposals in the third quarter of 2023 and then announce its two "Lane 2" awardees during the summer of 2024. It's entirely possible, even likely, that New Glenn will not have flown yet when this decision is made.

Perhaps the most interesting little bit is a report that Boeing will propose to use the Space Launch System - SLS.  

No, wait, they're serious ... "We believe the proven SLS capabilities can be an asset for the ... [NSSL] Phase 3 contract," the company told Klotz. While I applaud Boeing's ambition, it is difficult to see the SLS rocket being seriously considered in an open competition. Its price (probably above $2 billion) will easily be five times, or even 10 times that of the rockets it is competing against, and, with a low flight rate, it is unlikely to answer the military's priorities for schedule and reliability.

A Falcon Heavy rocket launches the USSF-67 mission for the US Space Force this past January (2023).  SpaceX photo.