Monday, April 24, 2017

Completing the G0704 CNC Conversion

To the extent that a project like this is ever "Done", this one is done and what I write from now will mostly be either what I do with it, or improvements I make to it.  The mill itself is now done.  I think all CNC hobbyists end up tweaking their machines as part of their hobby, though.

I started putting together a project page which appears in the "Special Pages" list in the right hand column.  I've moved that up to just below the Florida Gun Blogs section.  It became apparent to me that the page needed an introduction and a conclusion; this is the conclusion.

The last thing I wrote about the project was that I had a small but persistent oil leak out of my oiling system onto the floor.  Small as in 3 or 4 drops in a day.  As my last fix, I replaced the push to connect fittings with plastic barb fittings.  Because I used 5/32 OD, 1/8 ID tubing everywhere, I needed a fitting that went from 1/8-27NPT male threads to a barb in that size.  I couldn't find one, but I could find a fitting that I could adapt to and make work by using a short piece of 1/4 tubing.  It ended up looking like this, and has not dripped one drop of oil in 5 full days.

People considering building something like this will wonder if it's worth it.  In response, I'd have to ask why you'd consider building it.  Do you need it now, urgently? Are you trying to learn what's in a system like this and make one, just because?  

If it's purely to save money, it might not be the smartest thing to do.  The G0704 is $1359 today (including shipping).  Automation Technologies will sell you a ready to run, CNC converted G0704 with an Ethernet interface for $4000 (I don't think that includes shipping while the Grizzly price does).  That's paying $2620 more to have it now as opposed to working on the conversion as long as I did.  I'm not 100% sure I've captured every expense in my journey, but I think I spent close to that amount, maybe more.  That prebuilt machine doesn't appear to have an oiling system, a chip tray, and an enclosure, all of which mine does, and all of which were considerable effort and expense to get working. 

How long did it take me to build it?  I actually started in June of 2015, six months before retirement.  Once I had all the parts made for the approach I was taking, in March of last year, I switched approaches rendering all of what I'd made useless except for the Z-axis motor mounts.  I started in early April '16 and had the system running on all three axes, ready to use this February 2nd; 10 months.  It wasn't full time work, but I worked several hours every day, weekends included. 

A really good machine that has more travel than mine, is the Tormach PNC1100 from Little Machine Shop at $8500.  Tormach is industrial quality without a doubt, and I have no doubt it outperforms mine.  It still isn't complete as it doesn't have an enclosure around it and I'm not sure if it includes an oiling system.  The next cheaper Tormach that LMS carries is priced at $7000; it has less travel than mine and a motor rated for less power.  Both of these machines include things I can only aspire to at this point - automatic tool changer systems, and tool holders (the Tormach Tool System - as an add-on, it's half the price of their milling machine) and very likely more.

So I spent about what the Automation Technologies G0704 costs but ended up with a more complete system.  I also made and remade a lot of parts and got experience I've never had before with the tools.  With my $2600 or $2800 I not only bought the conversion, I bought an education.  If my only goal was to have the completed machine, it's a perfect illustration of "penny wise but pound foolish".  If that's your goal, buy one of those machines.

On the other hand, think of a mill like these as a system; a chain of parts that's subject to the adage that the chain is no stronger than the weakest link.  During the design, all of the components are chosen based on the expected use of the mill.  When you replace leadscrews with ballscrews, the table can go faster.  All well and good.  The spinning cutter, though, will only take so many cubic inches per turn, depending on how fast the spindle can cut off chips of metal without stalling.  How fast the spindle can rotate under load depends on how much power the motor is able to deliver to the cutter.  If you want to remove the most metal in the least amount of time, a CNC mill needs a faster spindle than a manual machine's.  Mine spins at 2300 max; those Tormachs can spin at 10,000 RPM.  The motor's horsepower determines how much force ends up getting put on the whole machine, which in turn affects how much the machine bends and deforms during a cut; which determines how rigid it needs to be and how big and heavy it needs to be.  Plus, I think that worrying about "removing the most metal in the least amount of time" is where industry lives, not hobbyists. 

Don't go thinking "I can put some ballscrews and nuts on this machine and it will be zero backlash and as good as Tormach".  First, it's possible to end up with backlash - I did.  That's in my list of stuff to tweak on and make better.  Second, like I said, this is a system and you're replacing parts in a system with upgrades expecting it to get better.  It's also possible you'll improve one thing and discover weaknesses in other areas.  The way I look at it, you generally get what you pay for.  The Tormach has the advantage that it was designed from the ground up to be a CNC mill on a small production line.  You don't buy the $4000, ATI-built G0704 and expect it to equal the $8500 Tormach - which itself is not going to equal a $50,000 HAAS. 

If you're the kind of person who approaches most problems with "close enough for government work", machining is probably not for you.  I don't have any measured numbers on what sort of accuracy to expect in the converted mill, but I think these are a good choice of a home machine for the vast majority of your mad scientist projects that will fit on it.  The mill as received from Grizzly was a good performer as a manual mill, and it should still be one.  You're not going to cut a titanium turbine for a 747 engine on it, but maybe you can cut one for a model engine. 
5-axis machining is possible with the G0704, but not the way I've configured it now.  I have all the parts of a fourth axis that I intend to get running soon. Maybe after the GB-22. 

EDIT 4/24/17 2025 EDT - Added the link to the project's page in the second paragraph

Sunday, June 7, 2015

This Weekend's Main Project Has Been...

Note:  This post has been edited since the project's completion to clear up some technical details I got wrong.  

Getting all the pieces on order to convert my Grizzly milling machine to CNC-based.  I spent a while considering whether I wanted to go that way or just add some sort of digital readouts (DROs).  My bottom line is that CNC costs more than DROs, but not that much more, and for that extra cost it does much more - as well as acting as a DRO.  After researching the topic on a couple of hobbyist machinist forums, I settled on the approaches used by "Hoss" at Hossmachine.info or G0704.com.  Hossmachine is aimed at the smaller SIEG X2 and X3 milling machines while G0704 is aimed at it and the other machines based on the same basic machine, the BF20L. 

Hoss has a couple of different approaches that he calls Phases 1 through 3.  That added extra confusion to me, and I bought his DVD ROM (based on recommendations on three different hobby machinist forums).  The three phases are three separate approaches to building a CNC system and comprise the two basic approaches to CNC'ing the mill.  Phase 1 is the simplest: it attaches motor mounts to the existing hardware (lead screws).  Add motors, controllers, the wiring need to get it hooked up, and off you go.  This is the way my CNC Sherline is designed and I'm going to do this on the Griz.  Lead screws are serviceable, but aren't considered ideal in the CNC world.

The problem with lead screws from the CNC viewpoint is backlash, that moment when you change directions and the wheel moves before the table does.  Backlash can be compensated for in CNC, just like you compensate for it when you're working by hand by turning the crank farther than you need to when you change direction.  I think I've said before that an old Master machinist once told me, "your machine has backlash; get over it.  They all do".  Unfortunately, software backlash compensation isn't a perfect process and while it removes gross errors, at the scale of "tenths" (.0001"), a circular cutout can take on almost a cloverleaf shape.  That puts a premium on making the machine as backlash-free as possible.

Lead screws have one major advantage, though: they allow you to use the mill with the CNC controller turned off (although you lose the DRO equivalence).  If the motors have dual shafts, you can attach the motor's front shaft to the lead screw and put a hand wheel on the other end.

The alternative to lead screws is to use ball screws (for example).  Ball screws convey motion not by screw threads pushing on each other, but by ball bearings pushing on their channels.  (There's a tremendous amount of information on screws of all kinds at Lead-Screws.com on their "Application Engineering" page).  They say the big advantage of ball screws is lower backlash, more on this later as the project develops, but the price for that is they don't offer holding torque to keep things from moving when you don't want them to.  If I stop turning the hand wheel on my mill, the table stops moving due to that holding torque.  With ball screws, pressing on the table will make it move.  The holding torque is provided by the motor, so it's impossible to use a ball screw driven CNC without the motors running. 

The Phase 2 or 3 versions use different ballscrews from different manufacturers so the hardware for ballnut mounts and such is different.  This is a much bigger project.  The mill needs to be completely disassembled, since you need to replace the lead screws on all three axes, along with their mounts, and modification of the cross slide is required, but the result is a most likely a higher performance system.  I understand that Hoss created Phase 3 due to availability of a lower backlash ballscrew at a better price point.  It's important to note that the Phase 1 system can be changed to ballscrews in the future with just the additional work.  Furthermore, there are options for both Phase 2 and 3 that put the motor on the front or the back of the Y-axis, and an option that adds a spacer between the mill's base and the Z-axis column to increase the Y-axis travel.  Again, going with the Phase 1 lead screw approach doesn't mean you can never upgrade to Phase 2 or 3.  I believe, but am not sure, that Phase 2 is really obsolete, but even if you do Phase 3, there are things you'll need to know from the Phase 2 folders on the DVD.

The lead screws on the X and Y axes on the G0704 are 10 Turns Per Inch (TPI).  One turn of the hand wheel moves the table 0.100 inch (those numbers are 20 TPI and .050", respectively, on a standard Sherline).  A 200 step motor divides that into .0005" per step, although it's highly likely that the movement is not that accurate for every step.  Further, stepper motor controllers divide that .0005" into 8 or 16 steps, called "microstepping" (1600 to 3200 microsteps per rotation).  In principle, that would make your smallest step 62.5 millionths of an inch (8 microsteps) or half that, 31.25 millionths of an inch (with 16 microsteps).  That accuracy can't be counted on.  What it's really good for is smoothing out the motion of the motor.  The Z axis is a 6 TPI screw, so the headstock/cutting tool raises or lowers 1/6" or 0.1667" per turn.  The 200 step motor makes that .000833", and you can do the rest of that arithmetic if you want.

In reality, you can expect accuracies on the order of 1 or 2 thousandths out of a machine like this.

It's important to realize that a product like the G0704 is a system.  During the design, all of the components are chosen based on the expected use of the mill.  When you replace leadscrews with ballscrews, the table can go faster.  All well and good.  The spinning cutter, though, will only take so many cubic inches per turn, depending on how fast the feed moves and how fast the spindle rotates. How fast the spindle can rotate depends on how much power the spindle can rotate the cutter with.  If you want to remove the most metal in the least amount of time, you need a faster spindle than a manual machine's.  The motor's horsepower determines how much force that can be put on the whole machine, which in turn affects how much the machine bends and deforms during a cut; how rigid it needs to be.  Keeping the leadscrews and original spindle avoids some of those secondary effects.  Plus, I think worrying about "removing the most metal in the least amount of time" is where industry lives, not hobbyists. 

Hoss recommends 570 in-oz torque motors and a set of controllers from Automation Technologies.  I'm just going to go with his approach unless I find reason not to.  Add a power supply, (mine will be a 48V, 10A switcher) a breakout board from CNC4PC which turns parallel (printer) port signals into the signals to the motor controllers, throw in some some odds and ends (wires, switches, etc.), and you have a system.  To control the system, I'm going to keep using Mach3, which I bought years ago.  Mach4 was on display at Cabin Fever in April; I need to spend some time getting caught up on what's different about it.  I see it doesn't use the parallel port control, as Mach3 does, and that's a complication I haven't looked into in detail.  My plan right now is to use another old, 1-ish GHz, XP machine that's currently a door stop.  A stripped down old PC with XP works fine as a controller, if it's off the internet.  (In the Linux world, there's a program called LinuxCNC if you absolutely don't do Windows).  Modern computers have largely abandoned the parallel printer port, and getting it to work properly has always been a struggle as Windows takes lower level control of the ports with every version. 

The DVD also includes materials lists, and I went through my aluminum stockpile this morning to make sure I had everything I need to make the motor mounts and the few other pieces of machined metal it will take.  Didn't need to get any of that.

So with the rest of the day to play around in the shop, I played with the Griz mill making a guitar nut/string height adjustment tool based on that one.  Got about halfway through and realized I didn't have an end mill I needed.  I'll go order one from Enco or someone real quick.  This is it cut to size, and with a slot prepared for the digital depth indicator I picked up for woodworking. 
Hoss has a YouTube channel and shows a lot of videos of the things he's done to his Griz.  A ton of videos come on the DVD but several of the videos on the YouTube channel aren't on the DVD.  I'm not sure how much time to spend on this project here on my blog; for one thing, it's not my design and I can't say much about it.  We can talk CNC systems in general as much as folks want.  Once this project is done, and it should be over the summer, honest evaluations are what I'm here for.  I strongly suspect he wouldn't want me showing lots of details that he charges for!

As always, anything you'd like to see covered, let me know.

EDIT 4/24/17 at the project conclusion. to correct some technical errors, errors describing Hoss' DVD and CNC mills in general.


Tuesday, January 3, 2017

The Oil Fittings Are Fitting

As a followup to my post from Thursday about plumbing the oiling system for my G0704, there was a discussion about getting a good tap locally.  Reader and frequent contributor Mark Matis pointed out in a comment that Ace Hardware had a 1/8-27 NPT tap listed online.  The "check your store" feature said to call the stores to check status and my closest/most convenient Ace Hardware had one in stock.  It just doesn't get better than that.  I tested it on one hole, found it made a tremendous improvement over my Horrible Freight tap and then the holiday weekend happened with the other things I wrote about. 

Today, I finished getting all the holes in the slide tapped and the fittings mounted.  Here's three out of four:
There's another right angle fitting on the far side of the slide, which is probably not worth posting a separate picture of.  The main oil distribution is on this side, and I'm using three-way "Tee" fittings to split the oil lines in different directions.  There are two different-style fittings on the ball nuts that will stick up from the two openings in the cross slide, so six different hoses will end up on this side.  There will be a hose that sends oil up the Z-axis to the mill's headstock, which will have a two way split to dribble oil on both of the Z-axis dovetail ways. 

Eventually, the tubing and oil distribution will look something like this:
This portion of the modification is on Hoss's open web site, not on the copyrighted DVD that I bought, so I assume I can link to it.  You can see this picture is a screen capture from a YouTube video here.  I anticipate people searching for information on the Grizzly G0704 CNC conversion, the G0704 oiling system and so on might (will?) find this page.  I should bundle up links to everything I ever wrote on this project and make it a separate page, like my AR from an 80% lower page. 

Now I really have to figure out how to get the ball bearings back into the ball nut and get back on track with completing the base.  Before I take off the Z-axis and headstock and modify all that.  Aw, gee... guess who has a video on doing it?


Monday, September 25, 2017

Decisions, Decisions

After living with my CNC G0704 since last spring, I'm pretty happy with it.  I can see a few things to improve it and reasons not to do anything.  Lately I've been asking myself what's worth doing.  I thought I'd update on what's going on in the shop. 

The three things that would make life a bit better are - in no order at all:
  • Improve the enclosure
  • Implement a standard way of handling and changing tools, probably the Tormach Tooling System
  • Swap the motor - or change the way it's implemented - to double or triple the spindle RPMs.  Also, add turning it on or off and setting RPMs from the computer. 
The short story on the enclosure is that it wasn't very well documented and it's almost a bit of an afterthought.  It's not very robust and isn't the way I think I'd do one if I were starting from scratch.  I've seen better looking, and doubtlessly more expensive enclosures since then. 

The enclosure was based on one that Hoss built for his mill, and like many folks, my conversion was based on his DVD.  Of the many CNC-converted Grizzly G0704 mill/drills out there, it seems that the majority use some version of his approach.  It's not really shown on the DVD I bought, but rather there's a handful of videos on YouTube and many details get talked about in his CNCZone Forum.  

On the other hand, the purpose of the enclosure is to keep the chips and overspray from my misting cooling system inside, and it definitely does that and does it pretty well.  With the exception of the top rail being low so that when I lean inside I bang my head on it about 25% of the time (I am learning to reflexively bend over), it works.  It rattles if you bang it, but the latches hold it down, so this is a pretty minor "nice to have" upgrade. 

The Tormach Tooling System would be an absolutely necessary addition if I was a professional shop trying to recover my costs of doing things.  But I'm not.  For those folks not familiar, the way tools are mounted in mill like this (like most) is with a tool holder that goes inside the spindle.  That holder will hold the cutter, a drill chuck, or other tools.  The G0704 uses an industry standard spindle size, called R8, and R8 collets for all sorts of tool sizes, dedicated tool holders like drill chucks or other things can be found.  The way I change tools now frequently requires me to change the collet and the cutter, then find the new position of the tool.  Back in June, I told about a "touch plate" that uses a piece of software to set the Z = 0.000 inch point. 

What Tormach does is use one slightly-modified R8 collet that is permanently mounted in the spindle.  This is sized for a 3/4" diameter tool, and they have a series of holders that are a 3/4 bar on one end and a custom holder of some sort on the other end.  The feature here is that if the collet is slightly loosened, the tool and holder combination can be swapped with another combination and the system registers the position of the new cutter very precisely in all three dimensions. 
The holders are intended to be used with an automatic tool changer, but can be mounted by hand.  The R8 holder system uses a large bolt (7/16-20) that draws the collet up and tightens the hold on the tool; that task is frequently automated with a power draw bar that releases one tool and then grabs its replacement once the tool is mounted.  The act of tightening the draw bar is what precisely positions the cutter.

In principle, once you find zero for your axes, you always know where X=0 and Y=0 are, and the only axis that might change is just where Z=0 is, if the tool is longer or shorter.  My touch plate can give me that.  What this means is that it might take me extra time to change the collet, change the cutter or drill bit and re-zero, but if I'm not trying to minimize my cycle time in order to keep my price down, do I care?   Except for the obvious neatness factors, I'm not sure I do.

The big drawback to having a separate holder for every tool is that I'd need a separate holder for every tool.  Right now, my tool box has a lot of different size cutters in it.  Many of them need the same size holder, 3/8", but it would be extreme to get one for every cutter in the drawer.  There's a small number that I use the most often.  They would get a separate holder and a permanent place in a software tool table, so that my controller software knows the diameter and length of the tool. 

How much does all this neatness cost?  It could easily run several hundred bucks.  I haven't actually run up a total cost, but I've seen an eBay seller with "clones" of the TTS holders at about $18 each, including shipping (from guess where), if I buy 10.  In addition to those, I'll need collets for the tool end of the tool holder.  There's a few series of standard collets, called ER and then two digits to designate the series.  ER-16, ER-20 and ER-32 are commonly used and I'm likely to need a bunch of those.  In the case of the 3/8 shank end mills prices on Little Machine Shop tell me I'd need an ER-16-9 collet at $9.66 (based on being one of a set of six different sizes), and a TTS ER collet holder at $34.75.  That's $44.41 to hold one tool - and those are "real" TTS tools, not the cheap clones.  As a WAG, I could cut that to about $25 each.  Still not insignificant if I have 10 or 15 tool holders. 

Yet it seems all it really does for me is to make getting a precise Z-axis position easier, a task I've already automated.  Since I'm not trying to shave seconds of a mass production product, it just doesn't seem to matter. 

Finally, the motor.  Here I know the least amount of hard details, but the issue I'm trying to fix is that the max spindle RPM I can get is around 2200.  Another thing to upgrade is that I currently turn on the motor manually by pushing a button on the mill and set the speed with a knob next to it, but both of those operations are simple, standard CNC code.  I just don't have a control that works over the interface yet. 

Virtually every time I'm cutting aluminum, my speeds and feeds calculator tells me to run higher RPMs than 2200.  What's wrong with going 2200 when the software would rather have me go 3600 or 4400?  It wears out the tools faster.  Tool life is a balance of how fast it rotates and how fast it cuts into new metal.  On the other hand, whenever I cut steel, the recommended spindle RPM drops down well below the 2200 limit.  The current motor is specified at 1 HP (750W) and while I'm not sure it even does that (I know... running downhill with the wind at its back), I don't think I'd want to go much above that.  I understand that 3 phase motors are quieter but that will require an electronic box called a Variable Frequency Drive.  A motor like this has been recommended to me.  Whatever motor I'd choose would end up needing an encoder to send speed information back to the controller program, and would need to accept control inputs. 
(Automation Direct GS3-21P0 VFD)

Again, I'm looking at around $500 to implement a better motor.  I might only need the higher RPMs sometimes, but it would be quieter all the time, and I could control it with my CNC control box. 

Since I'm not Elmer J Fudd, millionaire, this raises the usual questions everyone has about the budget only being so big.  Of the three, the motor upgrade might well be the most expensive, but it seems to  make the most sense. 


Thursday, July 7, 2016

Updates and Catching Up

I haven't specifically updated my personal situation since I was discharged from the hospital.  I have been posting pretty regularly, so I think anyone keeping track will see I'm doing steadily better.  So just in case anyone was curious...

Two weeks post surgery was two days ago.  I saw the surgeon for followup last Thursday, and he discharged me to my GP for care.  All of the surgical dressings are off and I'm adapting pretty well to not having a gall bladder.  Not much in the way of stomach upset and that was all last week.  By coincidence, on Tuesday we had to drive up to the hospital to get copies of some records I need to bring to a followup appointment, so two weeks post- was the first day I drove and walked around parking lots and buildings since before everything hit.  The car's temp sensor dipped below 98 degrees once, when we got into the shadow of a cloud for several seconds.  It spent most of the time at 100 or above.  A bit on the hot side here, but not freakishly unusual. 

I'm aware of the "don't push it!" axiom - and Mrs. Graybeard reminds me regularly - but I have gotten back into the shop and resumed cutting metal for G0704 CNC conversion. My efforts have been directed to the big X-axis end cap I've written about several times. 
As I talked about, I'm converting it to two pieces: a large, 1/2" thick end cap (bored and drilled according to the original design) and a smaller, 1/2" thick motor mount/bearing holder that will screw to that piece with two 8-32x3/4" screws.  The original design had an area of the end cap here (marked by dotted lines) that was 1" thick.  Changing it to two pieces makes the big hole bored in the top piece a single diameter, and the dual diameter bore in the bottom piece changes its depths.  The area that was 1" thick gets a 3/8" thick motor mount/bearing holder on top of it.  My approach yields three pieces instead of two, but the overall dimensions are the same.  Just the two new screws are added.
Original end cap from G0704.com - it starts as a chunk of 1" thick aluminum and has most of it thinned away to 1/2" thick.  On the DVD, Hoss shows it being made, but he already has his G0704 running CNC and just lets it run for a while. 

As an aside, I have all the parts for my guitar meta-project but haven't actually assembled anything.  In that linked piece I said, "I could get a set of tuners, nut and saddle and have it able to make sounds for under $100 - maybe half that if I use no-name parts".  Actual out of pocket was $27, including shipping. 


Saturday, June 4, 2016

The Long Story of Z

When we last talked about the Z axis for my G0704 CNC Conversion, I had just completed boring the big hole to clear the ballnut housing.  Then I got a virus, took a week off to visit the granddaughter, and, well, next thing you know, it was June.

As I said in that piece, the next task was to drill and tap six 1/4-20 holes to match the ballnut. I barfed it up. The holes were far enough off that I could get only one screw in the ballnut at a time.
Now what? I've never relocated holes before, but it really is a fundamental skill we should all have. I know in commercial shops they may drill it out larger and put in a Heli-Coil, or use a welder to fill it, but I don't have a TIG welder and wouldn't know how to use it if I could borrow one.  So acting on the advice of a frequent visitor here, I got a quarter-inch diameter aluminum rod, turned it down enough to thread and made 1/4-20 aluminum screws to plug the holes with.  Used red Loctite to hold them in place, sawed them off with a slitting saw on my Sherline, then milled them just a little proud of the surface (like .002" high) with the G0704. This picture is with it still on the Sherline, before I milled them down.
I think my error was in setting my zero on the Sherline before I drilled, because after flipping the part, finding zeroes again, and putting a small peck at each hole with a center drill, the marks all appeared to be in the right place.

My adviser also suggested that since I have the master pattern (the ballnut that it has to mount), why not make a tool to fit in the holes that will better center a drill and mark the mount that way? So I turned down some 1/2" aluminum rod to fit the holes in the ballnut, then drilled them on the lathe for a 1/16" drill bit. I made four and put them in the four corner screw holes in the ballnut, and clamped the ballnut to the mount with C clamps. Drilled the holes with a 1/16 bit. Broke the first bit and while muttering obscenities and looking for the next size up to continue, found that "someone" had bought and stashed three 1/16 bits. No more excitement because I remembered to use just a tiny dab of tapping fluid. Once the four were drilled, I moved two of my tools to the center holes, re-clamped, and drilled them.

Moved it to the G0704 and mounted my drill chuck. Carefully centered the bit six times, using a 7/64 bit, then six more times using the bit that came in my old Craftsman drill and tap set for 1/4-20. While drilling the larger holes, I could feel that sometimes the drill advanced way too easily. Turned out that two of the threaded aluminum filler screws had backed out. So I put them back with more Locktite. The result: perfect fit.
The little tools are in the lower right.  These have a half inch head to grab with a turned down section that fits in the ballnut with a tight fit, and are center-drilled 1/16".

This part also has two holes in its base, perpendicular to these screws.  Those are drilled and tapped 5/16-18.  I won't be able to tell how well they're done until I have the mill apart to modify. 

So that's where I am now.  X, Y and Z ballnut mounts are complete.  I'm down to four parts to make: the X and Y motor mounts, the Y axis spacer and the X-axis end cap. The end cap has a lot of machining that needs to be done, and I think I'll do that last. I spent a lot of time making this part, though, so I hope I pick up some speed.  My first mention of it was May 1.  Even subtracting the week vacation, nine or ten days out of the shop, I spent close to four weeks working on this part.  I don't think any machine shop would hire me with time like that.  Not that I care.

 

Friday, September 19, 2014

Milling Around

A couple of months ago, when I posted about my new shop, I said I'd keep everyone up to date as tool selection proceeded.  I think I've converged a little, so let me start with the mill.

In a broad sense, mills can be classified by size.  The smallest classes are usually rather precise and are used for things like cutting small parts, model making and carving wax for jewelry casting. 
The model numbers across the top, X1 across to RF45, are common machine models.  The X1 to X3 are made by Sieg, the Shanghai Industrial Company, while the RF45 is from Rong Fu, a Taiwanese company said to make a higher quality machine.  Note the weights in pounds along the bottom.  The micro mills (like I have) are very easy to live with.  You can lift them to vacuum under, if you want.  An X2 class machine, at around 200 pounds is something you don't want to move very often, while the X3, RF45 and larger machines are something you want to move once, with serious planning.  Maybe build your house around them.  As an anonymous commenter said in that linked previous post:
A 700 pound mill not on wheels cannot be moved with body English. If you put it on wheels on a sloping concrete driveway you want a pulley to pull it up the slope. You can keep it from tipping over with your hand, but if it starts to go you can't even slow it down, jump away or have your safety buddy call for the jaws of life.
As Make Zine said, Sieg machines like X2s are one manufacturer with many brands. Not only that, the same machine is tweaked by some of the American sellers for different features: changing the table size is very common.  As always it's a bit more complicated.  There are other lines of machines, like Grizzly G0704 which is a little bigger and little more powerful than the X2 clones.  The G0704 is a representative of yet another maker's product, a BF20, sold by several suppliers. 
(Little Machine Shop's fixed column X2, their model 3990)

By now, I can hear lots of people saying "but what do I need?"  Again, it depends on what you're going to do.  If you want to carve out 80% lowers, you can do that on a good drill press.  I've done it on my Sherline.  Any of the X2 mills will do.  I'm simply not sure what tooling is needed to do a blank forging, a "0% Lower", or to make a receiver from a block of metal.  The 3990 has 10.6 inches of Z-axis travel and remember that any cutting tools or holders (collet or drill chuck) will eat up some of that.  That sort of work may need more Z-axis but it might be that those cuts can be done on a large lathe.   

Right now, I'm leaning toward this LMS 3990.  The Griz G0704 is a strong contender, though, and I'm still going back and forth between them.

Sunday, November 20, 2016

How I Spent My Sunday

I've been saying throughout my big project of converting my Grizzly G0704 milling machine to computer control that "every part is a puzzle".  That has taken on whole new meanings as I try to figure out how to add the powered oiling system that Hoss uses on the DVD I bought.  Now it's not a part I'm making that's the puzzle, it's the modification itself.  Hoss chose to put the oiling system on his publicly readable webpage, under the projects tab - conveniently here. 

I wrote about some of the work I was doing and what was coming soon behind it just a few days ago, and said, "It looks like the biggest task is to cut some channels on the surface of the cross slide that holds the table for the oil to flow between them.".   Since I successfully milled out the area where the ballnut for the X-axis goes on my micro mill, the channels aren't looking so scary right now. 
The cross slide in place on my Sherline mill for a test fit of the ballnut.  Milling the cast iron was tedious and the chips it produces are nasty, but it wasn't really difficult and I never heard the motors bogging down or anything.  (On the other hand, I have a better appreciation for where the saying "a cast iron bitch" comes from!)

This makes the long oil channels seem less scary, and the scary part becomes something that only shows up briefly in the top left video, "Oiling system passages".  Hoss marks off a spot to drill, looking freehand, and then drills a 1/8" diameter hole 4" deep into the cross slide from the one end.  Take a look at this picture I posted a few days ago:
While the hole doesn't go in the end closest to the camera in this picture, look at the marked lines on the right dovetail.  Looks like crosshairs or a target indicator.  Hoss drills the hole 4" into that piece, parallel to the table. 

One of the things I learned very early in my hobby machining is that drill bits can wander and not produce straight holes.  This is why standard drill bit sets have shorter bits for smaller diameters and longer bits for larger diameters.  The ratio of length to diameter is set to reduce the chance of wandering.  Most 1/8" bits have a fluted length of around an inch to 1 1/2.  This one needs over 4" fluted length.  I needed to order a 1/4" ball end cutter for the channels (coulda sworn I had one), so I ordered an exotic drill bit to drill the long hole, too.

As a result, I spent a lot of today trying to figure how to drill this with the best chance of success; going through the shop trying to find something I could rig up to hold the cross slide perfectly vertical for the drill press - or use the G0704 itself.  I could try to do it like Hoss does and just chuck up a long drill bit in my cordless drill and start drilling, or I could try to set the cross slide up with some sort of fixture that improves my chances.  And I swapped messages with Hoss.  He said, "you're over engineering this.  Just drill the hole".  Yeah, I can tend to do that. 


Monday, August 22, 2016

Shoehorns and Shop Machines

When I last updated the progress on my CNC conversion, I had completed the wooden chip tray, although I hadn't painted it. The paint came Tuesday, and I eventually got three coats of paint on the inside and two on the outside.  What I've been doing since Tuesday, instead of cutting metal, is 3D modeling on the computer.  I want to be sure things are going to fit before I start moving 300 pound machines around.  I am well past my years of looking at 300 pound machines and boasting, "I can carry two of them and drink a beer".

I was able to model the G0704 with the plywood chip tray in place.
While a "realistic" model isn't really needed - details like the red "STOP" button on the motor speed controller take tiny amounts of effort but aren't necessary - the size of the base is critically important, as is the size of the tray. 

Next I pulled out my floor plan layout that I originally created in '14 when the shop was being built, and then added to and tweaked as things were done.  The chip tray is 5'4" in the long direction, and 3' across.  I'd like two feet on each end, making 9'4" of floor space.  There's 6'8" between other stuff and the back wall.  Can't fit 9'4" with a shoehorn.   There's really not even enough room to put 2' of room on one end and the other against a wall, but that's a bad idea anyway.  Certainly while I'm building it (in place) and then while it's running, it's possible I'll need to get anywhere around it, and if I have to work on some side for a long period of time, I want a small chair (which is where my two foot border comes from). 

So now comes moving things around in the software to try and get everything to fit better.  In this corner of my shop I have the G0704, and my Little Machine Shop 3450 lathe.  I'm not sure it's possible to work on both the mill and the lathe without popping a breaker (maybe with light cuts on both machines), but I do want to be able to easily move from one to the other.  I needed to do a model of a chair I could move around and get a feel for how it fits, so I went searching for a free 3D model of a chair and found one I could modify.  Which was good because I don't know if it was the original or the translation into Rhino, but it came into Rhino being 65 meters across the seat!  (Obligatory, "even Moochell's butt doesn't need 65 meters").

I ended up making several copies in different modifications of the chair to get a feel for how much room there really is.  I think this layout will work. 
The bad part is that both heavy machines have to move.  I can't just put the mill in place without touching the lathe.  I have a shop crane to lift the heavy things, but it makes the job bigger.  A heavy duty extension cord or two may be needed. 

The large gold/mustard colored rectangle to the right of the mill is the LMS lathe set up with operator's position on the left looking right and its headstock on the left.  As positioned right now, it could handle a rifle barrel 34 or 36" long.  To the lathe's right is a set of bookshelves in front for manuals and catalogs, a rolling cabinet and more benches behind them.  To the left and in front of the mill is where my Sherline micro CNC stuff is.  You might notice nothing has the level of detail the mill and chairs do, although the bookshelves are close. 


Tuesday, May 16, 2017

A Rotary Axis for the CNC G0704 Mill

When I first started out on the G0704 conversion project, it was always in the long range plan to make the mill a large version of the Sherline/A2ZCNC hybrid I was coming from, and part of that was to add a rotary axis and make it a four axis CNC machine.  When I bought parts, I planned for the fourth axis: four of the big NEMA 23 571 in-oz motors, four stepper controllers, and so on.  I chose the rotary table that would be used early last fall and caught it on a Black Friday sale at Wholesale Tool.  Things like this don't go on sale very often, and I was glad to get it for 20% off (IIRC).

Today, I completed the modification to the rotary table and got it running.

Now considering I've had the table since around December 1st, you might want to ask why it took me so long to get it running.   Especially considering I finished the mill in early February, and have been tweaking and improving it ever since.  It's really a simple story.  The first time I tried to pull the crank handle to see what it takes to mount a motor, I couldn't get the handle off.  So I said, "some day when I have some time" and there it sat.  Well that reason and not having a pressing need for it. 

The trick was to assume the handle could be persuaded to come off with a few light taps of a hammer on a screwdriver wedge, which it did.  The handle covered a pair of concentric cast iron disks, which is probably one casting finished differently on each layer.  It had three holes in it, although they weren't used.  I compared the pattern to one of the leftover "Phase 1" motor mounts I made over a year ago, and found that holes didn't line up, but that I could add new holes to my motor mount and drill and tap two new holes in this piece.  It looks something like this.  You can see the two new holes on the left and right of the centerline:
With the two new holes added to this, and the motor mount drilled to match, it was simple to put together.  I had some threaded standoffs leftover from Phase 1 as well; some that were too long some that were too short.  Clearly, I used the long ones, which were cut off and re-threaded. It went together with no issues whatsoever. 
The motor mount is held to the rotary table (far right) with two 8-32 screws; the motor is attached to the threaded standoffs with 10-32 screws, as the standoffs are attached to the motor mount.


Now that it's done, it's probably going to get put aside for a while.  There are no projects in the queue that require one.  A rotary axis is essential for some projects, simplifies some and has no use in others. 

For those of you who are new to this subject, and wonder why someone would do this, here's a brief overview.  Rotary axes can be introduced parallel to the two main Cartesian axes.  The rotary axis parallel to X is generally called the A-axis and is most common.  One parallel to the Y axis is called B.  Aside from an A-axis, like mine is mounted, the most common "next step" is a full five axis CNC mill.  The guy whose plans I bought for my starting point, Hoss, has used this rotary table to make a "Fifth Axis" version of his mill.  He says he didn't use it enough to keep it and just left the rotary table in place.  The drawback to fifth axis mills, besides the cost of the machine, is the cost of the CAM software to take advantage of it.  That's the main reason I'm sticking with using it as an A-axis. 


Sunday, January 29, 2017

The Clearance Problem Has Been Cleared Up

A couple of days ago, I wrote about putting the table back on my G0704 mill and finding a problem with clearance around the oil tube to the Y-axis ballnut.  I concluded by saying, "Will the thinner tube lie lower and flatter in the cutout and be less susceptible to damage?  We'll find out."  The answer is it didn't.  The next morning, I could see that the tube had relaxed to the point where the table was hitting it.

The root cause is that the vertical edge on that part of the table goes over the oil fitting. The tubing is almost completely under the slide.  It's easy to see when the tube is off. 

I pulled the new bent tube and made another one out of a longer piece so I'd have more tube to play with.  After I heated the tube and flared it so it fits the oil fitting, I stuck the plastic tube from a spray can of air in it, held it over a heat gun and bent it a little past a right angle (plastic tube to emulate something like putting sand in a metal tube before you bend it - to keep the walls from collapsing/kinking). This was definitely a lower profile bend. I put that in place, but a straight edge sliding over it still rubbed on the tube. If I held the tube down with a finger tip, it seemed to clear, so I put a spot of RTV there and then taped it down with duct tape. It was still too high, so I stacked about 15 pounds of weights on top of it to clamp it as low as it gets. The tube said RTV takes a full 24 hours to cure, but after about 18, I took off the weights and tape to look at it.
That worked. You can see the gap between the tube and slide in this picture. The white thing is a scrap of business card that I measure at .010".  A .012 feeler gage slipped in there, but a .015 wouldn't.  Is that good enough?  My bet was that if I could be sure that it never went below .005, I'd feel good with it, but I didn't know. 

So I decided to machine away the part of the table that crosses and could rub on the tube. The idea is to cut away the underside of the table at about a 45 degree angle - 45 degrees at "eyeball accuracy" is good enough.  The table is about 28 inches long, so you see it requires cutting away a fairly large amount of cast iron.  I had thought of doing this before but concluded I'd need a mill at least the size of the G0704 to do it. A friend suggested an angle grinder. I simply hadn't thought of that because I just don't have experience with using a grinder. I bought one months ago for this project and then used my Sherline mill to do the cutting the grinder was intended for.
So I pulled the table off and rolled it outside on a dolly (it weighs more than 50, maybe 60 to 70 pounds).  I marked a line about 2/10 of an inch from the edge of the table along the full length of this edge and ground it to look smooth.  This gives you an idea of what the last few inches of the table looked like after cutting. 

It ended up going very quickly and came out remarkably smooth. Now I have plenty of clearance over that tube.  

You know the old saying, "when the only tool you have is a milling machine, every problem looks like a machining problem"  (or something approximately like that involving hammers and nails)?   When I thought about cutting back that edge at a 45 degree angle or so, I though of using a 45 degree cutter in a milling machine, or a straight cutter with the table on a fixture of some sort.  I simply never thought of the angle grinder.  Mind you, as I've said about knife making, after a few dozen silversmithing projects, I've come to believe I can do just about anything with a few hand files.  I could have done this with hand files and taken a week of labor or a few minutes with an angle grinder.  The angle grinder is the way to go!


Wednesday, April 20, 2016

Back In the Shop

My recovery from my nasty week has progressed enough that I can walk or stand around without pain, so I spent most of the day trying to figure out just how to hold the stock and make a small part.  It's not done yet. 
For scale, that's a half inch thick piece of aluminum that's 1 3/8" long by a half inch tall.  The raw stock I'm cutting it is taller than that; around 0.9 inches (toward the top in this view).  The part that's slowing me is cutting out that sector of a circle.  I have two small clamps holding this piece down to the table, pretty much at each of those holes.  The circle diameter is 1.11" which puts the center of the circular cutout just barely still on the metal. 

I started out thinking the way to do this is the way I cut the circular cutouts in my previous pieces, but the exact lines of code I used that time would be inefficient here.  That time, I cut circular holes in the solid metal.  This time, I only have a part of a circle to cut. If I used the previous routines, I'd spend about half the time with the cutter in mid-air.  It's true that there are worse ways to spend my time, but I also think it's worthwhile to figure out how to do it the most efficient way possible. 

The next part is going to be a bit harder, too, but in a different way. Pictured here, it's a replacement for an existing end cap on the long (X) axis of the G0704's table. 
This part is roughly 7.1 x 2.2", and most of it is thinned down from a 1" thick piece of plate to 1/2" thick.  I ran this through my CAM program, and it tells me I'm looking at roughly 18 hours of machining time.  I'm not comfortable with thinking that everything can run that long without issues.  The only alternative I can see is to use the big mill, since it's all still fully usable.  It just has to be done manually.  The G0704 can take take off much more per cut than the Sherline/A2ZCNC mill can - which is why I bought it in the first place!


Sunday, December 31, 2017

Happy New Year 2018

New Year's Eve is upon us, and I just want to wish all of you a happy New Year.

2017 was my second full year of retirement and was better in a couple of ways than the first year.  The biggest was that the year was free of medical issues like my emergency gall bladder surgery in June of '16.  It was largely a year of doing what we felt like doing - the privilege of retirement.  We took two vacation trips, one to South Dakota for a week with the kids and Precious Grand Daughter; the other to Tennessee to see the eclipse and they met us there.  We currently don't have anything planned for 2018, so it's getting to be time to plan something. 

Retirement is a relatively new concept in society, at best a couple of hundred years old, and it's evident that society (in some sort of nebulous, society-at-large sense) is having troubles with it.  See "underfunded pension plans" with your favorite search engine.   

I was looking at last year's blog entries to see what I was doing a year ago, and most of my posts were about completing the CNC conversion of my Grizzly G0704 - a year ago this weekend, I was completing the plumbing for the oiling system.  I also pointed out traps and tripwires that Obama was leaving for Trump.  We've encountered some of them as the year has gone by.

I had the mill built into a functional mill, completely under CNC control by February 2nd.  That quickly turned into a couple of months of tweaking and  improving.   First was reducing backlash on each of the axes, followed by completing an enclosure made from 12mm aluminum extrusion and plastic panels from the local Borg (mostly the blue Borg, not the orange).  And no, I don't know where that nickname comes from, other than I think it was the old Usenet newsgroups (kids, ask your parents).

I can't say I was done, because as recently as a few weeks ago, I talked about improvements to the rotary axis I originally added last May.  I can still think of things to do to improve its usability and user friendliness.  Then came adding an oiling system, fighting leaks until I went over to manual oiling, and finally adding a misting cooler.  It's probably best to never think of a project like this as done.

Then, of course, there was my "Son of Side Project".  Originally, Side Project was a joke because the project was putting a new side on the sawed away Breedlove guitar.  The original side was plastic left over from making the mill's enclosure.  Son of Side Project was a sequel to Side Project to replace the plastic with wood.  Now, it has a quilted maple side where the plastic was.  I gathered up the tools to do a setup on it this week and now it plays quite a bit better.  The guitar was most likely a Quality Control reject, so it needed lots of work.  The frets were uneven and had to be leveled with a file.  It probably needs some additional work.  I know the $8, eBay-special tuning machines I bought for it need to be replaced. 

As far as projects with my CNC'ed, four-axis G0704 mill, I haven't accomplished much.  I built the GB-22 but never got it to function reliably.  It's still sitting as a "one of these days" project, in pieces.  I built the Little Machine Shop wobbler steam engine.  After drilling out the flywheel on my rotary table, I took the whole thing apart and put a shinier finish on all of the parts by lapping them on finer grits of sandpaper, and/or turning in the lathe's chuck.  Put it back together to find it doesn't run as reliably as it did.  I think I took too much mass out of the Flywheel.  I will turn a new one and get it back to where it was. 

In addition to my ham radio antenna project, I have another electronics shop project, a box for a component called a variac.  This will allow me to put lower voltages on older vacuum tube equipment, at least while I get it running the first time. 
The black rectangle on the top is an AC voltmeter/ammeter like one of these and the AC outlet on the front is still under consideration.  This is going to be like my controller box for the CNC 704, with the panels laid out in Rhino3D CAD and cut out on the CNC mill.  This time it will be cut out on the big system, though.

Aside from those two, I'm looking at more projects for the metal shop, with fewer involving guitar resurrection.

Happy New Year!  Remember, if you drink, don't text and if you text, don't drive.  Or something like that. 


Friday, May 13, 2016

I'm Just A Boring Guy

I had another piece that needed boring for G0704 CNC conversion project.  This one is the biggest piece that's going to get bored, a ballnut mount for the Z axis.  That's a bigger ballscrew/nut combination than the X or Y axes because of the bigger load it has to move.  Due to the part's geometry, I didn't see how to get it onto the lathe.  This time it was over to the G0704 to cut it.  Again, boring is a fundamental operation, and when I bought the mill, I bought a boring head as part of the tooling.  It's a clone of the Criterion style head (like that link, but not exactly).
That hunk o' aluminum is 1 1/4" thick, 2.9" long and 2.25" wide.  The big hole is 1.42 diameter and the boring head was spinning when I took this picture.  The piece will get a pattern of 1/4-20 holes in the large hexagonal area and some 5/16-18 holes into the base (on the left).  I'll do all the precision drilling on the little Sherline.  I'm all but sure this is the biggest hunk of metal to work in the job.  

To me, it's worth noting that this is the first time I ever had that boring head in the mill.  I've never run a boring head on any milling machine.  The diameter was supposed to be 1.420, and came out 1.423. 


Wednesday, June 8, 2016

I've Got The Angles Down

No, wait... I spelled that wrong.  I've got the angles done.  As in two pieces of 2 1/2 inch angle aluminum that just get cut to length and then some holes drilled and tapped on both ends.  One end gets 8-32 and the other gets 10-32; they're both 3/4" deep.
My scrawled writing of "8" in broad tipped marker and "10" in fine tipped marker was to remind myself not to space out and drill the wrong-sized holes.  Yeah, BTDT a couple of times.

This, as you can see, was pretty simple work.  I cut the pieces to length a few weeks ago and was puzzling over the best way to hold them for the drilling, finally deciding to use the G0704 as a precise drill press.  I found that if I clamped one edge in my vise, and left the perpendicular edge just hanging there in space, that the angle wasn't close enough to 90 degrees to dial in a position to drill.  Over the 2 1/2", the angle diverged from 90 enough to put the far end (far from the vise) about .012" out of place.  So I was able to hold the pieces in the vise with the two edges on one jaw and the corner on the other jaw.   I marked them "old school": I colored the areas where I needed to work with the black marker, then scratched out the location of the hole centers.  Setup was a bit more manual, but no big deal.

The bigger, more important piece is the Y-axis extension.  This is a replacement for the one I wrote back in March; that one got obsoleted by my change over to ballscrews.  Which negates all my concern about the other one being made slightly wrong.  This time, instead of cutting a big hole which gets a diameter step (counterbore) using my ultra light duty CNC mill, I bored this one out on the G0704 itself.
There's somewhat of a jigsaw puzzle of how all this goes together, which I probably shouldn't get into too much, but this part goes on the end of the Y-axis, and those two, big, counterbored holes on the ends get hardware to press it onto the cast iron body of the mill.  A motor mount that I'll make next goes on top of this, compressing a set of bearings that get mounted in the big counterbore; the bearing mounting helps take out backlash.   I'm down to three pieces of aluminum to cut: two identical pieces (motor mounts) which are fairly simple and small, and the big X-axis end cap I wrote about back in April which will take some time to machine.  Then it will be time to take apart the mill, which obviously means I won't be able to do any more work with it.  So I'd like to be pretty sure everything is in good shape and working before then.

All of the parts in this post will be visible when the upgrade is done (unlike the ballnut mounts I did previously) so I think I'm going to paint them.

Monday, February 8, 2016

My Other Project

I've spoken several times about my project to convert my G0704 mill to CNC, but this winter I have a project that has taken precedence.  I need to do some serious maintenance on my ham radio tower installation.  As in rebuild a lot of it.  It was put in place around 1990. 

I have just about the smallest tower that hams routinely use: 20' tall.  With a mast in it, it gets the top antenna up to 28'.    Most guys use a couple of 10' sections of Rohn steel tower (25G), burying one section a couple of feet and using one or two other sections.  When I put it in I designed a method of leaning the tower over to work on or remove antennas.  Living in hurricane country, I wanted to be able to get the antennas off easily.  My friend N4RFC (in the blog list) used to live a couple of blocks away, when we both lived in South Florida.  When Hurricane David was approaching, he and I took down both his antennas and mine, but then had to help another guy in the neighborhood take down his antennas.  He had broken his leg and was on crutches, so he was unable to do anything to help take down his antennas.  By the time we got to his place, the winds were getting up 25 or 30 mph and the two of us were on this third guy's roof, on a ladder, taking down his antennas.  That was my motivation to never have to do that again.

Mine is an aluminum tower, so it's lightweight, and the tower has a hinge built onto its base in the form of two "ears" of angle aluminum put in place before the cross piece was welded on.  I poured a concrete base and sunk a couple of redheads that those hinge pieces bolt to.  It's fairly easy to walk the tower up with just that hinge, but I wanted a way to crank it over.  A friend had a 10' long piece of 2 1/2" schedule 40 steel pipe that became my method.  I dug a hole 3' deep for it and put it in the ground at the same time I was pouring the concrete pad.  The concrete doesn't encapsulate the entire 3' of pipe in the ground, but just the top foot; the rest is just in compacted soil.  Once the pipe was up, I mounted a boat trailer winch to it at waist height and hung a pulley from the top end.  To lower the tower, I loosen one nut at the bottom, two bolts holding a clamp that attaches the tower to a house bracket, put a little slack in the steel wire rope, give it a little push and then crank the tower over until the antenna almost touches.  Then I wedge a small step stool under the tower and transfer the weight onto the step stool (slacken the wire rope).  In the case of hurricane warnings, I can have my antennas down and safed, and then be back inside with my feet up in under 30 minutes.

The centerpiece of all that is the pipe.  See up there where I mentioned it was "schedule 40 steel pipe"?  In a region where humidity is one of our major exports, rust is your enemy that never sleeps.  I had my first rust issues within five years, and I've been fighting rust on it since about 1995.  I actually gave up and said I have to replace it a couple of years ago, but something always got in the way to distract me.  Now is the time.  Swearing I never want to work on rust again, I got an aluminum pipe.  I figured out how much the pipe I have should bend under 200 pounds of load, and then sized an aluminum pipe to handle that.  Then I got one a half inch bigger.  (The amount of bending depends on a property called the moment of inertia of the shape, which scales as radius to the fourth power so an extra half inch makes a noticeable difference). 

For much of the last month, I've been rounding up parts to rebuild everything, and just dealing with all the pieces that need to be worked on.  I spent a full week trying to get a stainless steel U-bolt!  The bolt itself was hard to find, and the one supplier I could find wanted to charge me $19.50 for one bolt and almost the same to ship it.  With a little delay, I was able to pick it up in town with no shipping charge.  I spent another week trying to find a replacement winch.  If you don't want the same old standard stuff every home repair uses: PVC or ABS pipe in small sizes, or a winch with a nylon strap, it gets difficult. 

While all of my antenna projects tend to begin with "when it cools off", the other side of that is, "I've got to get this done before it gets too hot again".  I should be good for another six, maybe eight weeks; after April 1st, it gets more iffy.  But this is one reason why I've been a bit "on again, off again" around here.
Some of the problem.  Rusting holes.  Rust around bolts.  That cracked area near the bottom is Bondo body putty.  I cleaned out the rust, wire brushed it and sanded to bare metal with sanding drums on my cordless drill.  Dried it, filled the hole with Bondo and painted over with Rustoleum.  Two years later the rust was pushing the Bondo out of the holes. 





Friday, December 18, 2015

R E T I R E D

That's it.  Today was my last day - at least in this go around.

I started working full time in late 1975.  Before that, I worked part time while going to school.  Since '75, I've been unemployed for 6 weeks.  It was '82, during the post-Carter recession, when Fed Head Paul Volcker raised the prime rate to 21.5% (at one point) to stop the near-runaway inflation of the late 70s.  Since then, I've been laid off, but left one job on Friday and started another on Monday. 

Suffice it to say that not punching the alarm on Monday is going to be strange.  A friend who retired and is back (where I just left) said it took about 3 or 4 weeks for it to sink in, and I'm thinking the second week of January will be when I realize I'm retired.  It's the holidays, after all, and the plant shuts down next Thursday until January 5th, so I think I'll be in the Christmas break mindset for a while.  Once everyone is back at work, it will sink in.    

Everyone was asking what I'm going to do.  Projects, of course.  To begin with, all of my ham radio antenna projects begin with the phrase, "when it cools off, ..."  It hasn't really cooled off to the extent it can in a Central Florida December; tonight's forecast low of 52 is probably the coolest it has been since last March, but it sure isn't summer, either.  I need to do some maintenance on my little antenna tower, and see what kind of shape it's in.  I really haven't done a thorough look at all of it in at least a year.  Then I need to fix anything that needs fixing.

The main project is the CNC conversion of my Grizzly G0704, which I've written about many times, and I think I can get that going pretty easily now that I have more than just 3 or 4 hour days on the weekends.  Then comes a bunch of projects, but I don't really have anything chosen, yet.   

I have to admit, though, I'm a radio designer and I'd like to keep my hands in it, perhaps developing a Software Defined Ham Radio - although that market is saturating these days.  One of my good friends sent me email about an interesting option for serious home SDR or other programming options.  Computer graphics giant NVIDIA has put together a small computer based on one of their graphics engines, and calls it the Jetson TK1.  The heart of it is the NVIDIA Kepler GPU (Graphics Processing Unit) with 192 cores.  To control and run that, it has a quad-core ARM Cortex-A15 CPU; similar to the processor on the new model Raspberry Pi, except it's probably faster.  

The Amazon description refers to NVIDIA Kepler chip as having "192 CUDA Cores".  What's a CUDA Core?  The important thing to know about graphics chips is that they're floating point math engines, so at its heart a CUDA core is like the old "math coprocessor" chips you may remember.   Floating point math is more involved for a processor than integer math is, so floating point operations take longer than integer operations.  You may have seen reference to a computer running some number of "MIPS" - Million Instructions Per Second.  The equivalent to Instructions Per Second is referred to as FLOPS - Floating Point Operations Per Second, and a million of them is a MegaFLOP.  The Jetson TK1 runs 326 GFLOPS or 326 Billion FLOPS; almost a third of trillion floating point operations per second. 

At a third of a teraflop, this is essentially a supercomputer in the palm of your hand for under $200.   

I see at least one book on CUDA programming,  which says:
CUDA is a computing architecture designed to facilitate the development of parallel programs. In conjunction with a comprehensive software platform, the CUDA Architecture enables programmers to draw on the immense power of graphics processing units (GPUs) when building high-performance applications. GPUs, of course, have long been available for demanding graphics and game applications. CUDA now brings this valuable resource to programmers working on applications in other domains, including science, engineering, and finance. No knowledge of graphics programming is required–just the ability to program in a modestly extended version of C.
C is not my native programming language, but I've taken a class in it and done enough that I shouldn't be completely wet behind the ears.  I think with some refresher time, maybe online training, I might be able to crack the nut of developing the software and hardware of an SDR. 
The NVIDIA Jetson TK1

So far, I only have one job offer and I can't say for sure how serious it is or if I'm going to do it.  I have some things I'm interested in looking at to supplement income, but for now, I'd like to stay retired.  At least until summer when the weather gets crappy for being outside again. 

The same friend who sent me the information on the TK1 once told me that a previous office mate of his had done a lot of analysis on retiring ASAP or working longer.  This FOAF had done a thick binder of Excel sheets of scenarios.  The conclusion?  "Retire early - and often, if you have to".  In other words, get out ASAP, and if you need to go back to refill the account now and then, worry about it then.  Those are words to live by.