Showing posts sorted by date for query table saw. Sort by relevance Show all posts
Showing posts sorted by date for query table saw. Sort by relevance Show all posts

Friday, November 28, 2025

A typical Friday - in the world of the space industry

Today, of course, is the long-awaited and much-ballyhooed Black Friday - subject of at least a billion ads. In the corner of the world I like to keep track of, there were two things of note.  

  • SpaceX launched the Transporter-15 Ride Share mission from Vandenberg this morning at 10:44 AM PT. SpaceX reports this was the 30th flight of Booster B1071. At 2345 UTC, SpaceX reports it had deployed all 140 payloads designed to separate from the rocket.
  • In the aftermath of Thursday's Crewed Soyuz launch from the Baikonur Cosmodrome in Kazakhstan, which successfully carried Roscosmos cosmonauts Sergei Kud-Sverchkov and Sergei Mikayev, as well as NASA astronaut Christopher Williams, to the orbiting laboratory without incident, Roscosmos discovered some substantial damage to the launch pad. 

In a terse statement issued Thursday night on the social media site Telegram, the Russian space corporation that operates Soyuz appeared to downplay the incident: “The launch pad was inspected, as is done every time a rocket is launched. Damage to several launch pad components was identified. Damage can occur after launch, so such inspections are mandatory worldwide. The launch pad’s condition is currently being assessed.” 

Ars Technica is passing on additional reports to that quoted paragraph. 

However video imagery of the launch site after liftoff showed substantial damage, with a large service platform appearing to have fallen into the flame trench below the launch table. According to one source, this is a platform located beneath the rocket, where workers can access the vehicle before liftoff. It has a mass of about 20 metric tons and was apparently not secured prior to launch, and the thrust of the vehicle ejected it into the flame trench. “There is significant damage to the pad,” said this source.

While Russia has "plenty of launch pads" in Russia, Kazkhstan and former republics of the USSR; the issue is that Site 31 at Baikonur is the country’s only pad presently configured to handle launches of the Soyuz rocket and the two spacecraft critical to space station operations: their manned Soyuz vehicle and their unmanned Progress cargo drones.  

I get the feeling from reading what I can find is that I don't particularly doubt Roscomos' ability to fix the pad, and they say they have adequate spare parts to do it all. The issue is more along the lines of anything that might require more support from the government, which is rather tied up with their Ukraine issues. Much of that centers around the Progress cargo drones' trips to the ISS. Progress remains the only cargo vehicle to the ISS that seems rated to correct the ISS' orbit. SpaceX did that minor experiment recently that lifted the ISS but nobody that I saw would say they could take over for the Russians.  

Technicians work on the pad in Baikonur with the fully fueled Soyuz rocket. Credit: NASA TV

When I first ran into these stories I thought, SpaceX launched 140 ride sharing satellites, on the 30th flight of that booster, and it seemed impossibly easy, while Roscosmos almost lost the launch pad because someone didn't attach a 44 thousand pound (20 metric tons) service platform properly.  

Final words to Eric Berger at Ars Technica - as I often do:

The at least temporary loss of Site 31 will only place further pressure on SpaceX. The company currently flies NASA’s only operational crewed vehicle capable of reaching the space station, and the space agency recently announced that Boeing’s Starliner vehicle needs to fly an uncrewed mission before potentially carrying crew again. Moreover, due to rocket issues, SpaceX’s Falcon 9 vehicle is the only rocket currently available to launch both Dragon and Cygnus supply missions to the space station. For a time, SpaceX may also now be called upon to backstop Russia as well. 

 

EDIT 11/19 0815 ET:  The random brain fart generator threw one in that I didn't notice last night. Turned the original "44 thousand ton (20 metric tons)" to the correct 44 thousand pounds. 



Sunday, November 10, 2024

Veterans Day 2024

Looking back over the 14 years of this blog, it stands out to me that I've really said very little about Veterans Day. I suppose the main reason for that is that I'm not a veteran, but I do care about the cause and the day.  A few things this year have gotten me reminded of the day early enough to collect some thoughts. 

Image found online with no credit given, but it speaks to me.

A week ago, Quizikle posted a thing over on his blog that got me thinking. We're about the same age, he might be a year or two older than me, so when we were 18 we were both contemplating the draft implications and had decided the same thing. If we were going to get drafted we would have tried to enlist in the Air Force. For me, the year I turned 18 was 1972 and while Vietnam was still going on, it seemed to be winding down. It was a year or two after the draft lottery system was introduced, and I lucked into having a number that the press said was unlikely to get drafted that year.  

My parents were the first generation in both of their families to be born in the US, and while dad had enlisted in WWII, there was no long history of service in my family. It wasn't a topic of conversation around the dinner table and nobody I read or saw on the TV made it seem like enlisting would be a good thing. It really never occurred to me except as a last ditch effort to avoid being on the front lines. Big brother and I had known people who went and didn't come back. Or came back with fewer functional body parts than when they left.

Like everyone else, this was the end of my last year of high school, meaning I had applied to a couple of colleges and was trying to set up to start that life in a few months. Because of my SAT and NMSQT scores, I was immediately accepted to the two I applied to and invited to apply to many more. While I had been an electronics hobbyist for five years, my plan wasn't to go for Electrical Engineering, but to study Nuclear Engineering.  Why, according to all the ex-spurts we'd have fusion reactors going everywhere in 20 years. That would be before I was 40!

Unfortunately, my dad had an accident at work (sorting mail for the US Postal Service when that was done manually) and re-injured an old injury from a training accident in WWII and being on some sort of injury leave, their ability to help fund my college fell apart. The injury eventually forced his retirement. He passed away a decade later.

That's a bit of a long story, but only a setup for the really long story of how that year screwed up all my well-imagined plans and took practically the next decade to unscrew.  One thing I probably never imagined I'd ever say, back when I was 18, was that I would have gotten a lot of good out of some of the training and work in the military - specifically the weapons side. There could have been a lot gained.

My deepest respects to those who took the road I didn't. Far more than I could say. 



Monday, May 13, 2024

Sierra's Dream Chaser On the way to KSC

It has been a while since we've heard anything about the acceptance and qualification testing of Sierra Space's Dream Chaser vehicle. That was in early February when Sierra Space did a public showing of the "mini space shuttle" at NASA's Neil Armstrong Test Facility in Sandusky, Ohio.

We learned today that testing has wrapped up in Ohio and the ship is bring moved to the Kennedy Space Center on Cape Canaveral where it will undergo its final tests before being mated to the Vulcan Centaur it's scheduled to ride to orbit. While no expected date is given, United Launch Alliance wants to get this launch accomplished before the end of '24 to complete certification of their Vulcan Centaur for DOD payloads. 

There has been speculation that Dream Chaser wouldn't be ready this year and that ULA has been considering either another payload or just lifting a dummy weight into orbit.

The first test saw the space plane, along with its additional cargo attachment ‘Shooting Star’, connected to the Vulcan Centaur stage separation mechanism for a shock test, followed by being placed on the most powerful spacecraft shaker table in the world. This testing took place over 5 weeks as teams replicated the conditions the space plane would see during launch on Vulcan. They also conducted the same testing but replicated the separation of the cargo attachment from Dream Chaser before de-orbiting.

After that round of testing, the space plane was moved into a thermal vacuum chamber which can cycle temperatures from -150F to +250F (-101C to +121C), the same temperatures it would see while in space.

Photo during testing on April 3 of the orbiter Tenacity and its cargo module Shooting Star inside the thermal vacuum testing chamber at NASA’s Armstrong Test Facility. Image from Sierra Space on X

Sierra also posted a video summarizing their time at the Armstrong Test Facility and their journey to this point. 



Friday, April 21, 2023

I'm Leaning Toward a Simple Explanation

I think everything that went wrong with Starship's first Flight Test can be traced to the OLM and especially the concrete underneath it disintegrating in the eight to ten seconds that the first stage built up enough thrust to lift off.  Flying debris took out engines, and damaged the Hydraulic Power Units (HPUs) that power the engines to gimbal.  A system that's going away on the next generation Raptor engines, to be replaced with some batteries they got from a Tesla.  

Earlier today, I added to the comments on yesterday's post a link to a photograph that showed up today in the NASASpaceflight.com thread devoted to the mission.  Later on, I edited the post to include the photograph and edited the comment to tell the story.  This link will take you directly to the photograph.  It shows the damage to the OLM was far worse than we saw yesterday.

It's also worth watching Scott Manley, as usual, who has some good observations and points out things to notice.  At just over 10 minutes, there's a lot of information in it.  This picture is a freeze-frame from T+07 seconds, and I've circled what appears to be a flying L-shaped chunk of concrete.  There are at least two other enormous pieces of debris flying up around the same time in the video (14 to 17 seconds from the start), both to the left and right of this one. Starship is 9 meters diameter (nearly 30feet); that makes the concrete chunk look at least 20 feet long and 5 ft vertically.

Screen capture from Scott's video, processed to enhance contrast and visibility of that chunk by me.

There have been reports of the hydraulic power units (HPUs) failing early, possibly due to chunks like this.  There are reports of damage all around the launch complex.  This video shows a NASA Spaceflight van getting pounded by debris, and smashed up badly, along with a lot of other things being damaged. Cameras, perhaps telescopes, lots of thing get knocked over.

In the early days of building up the "stage zero" launch infrastructure there was talk about building a flame trench or a water deluge system like we typically see at the major launch facilities (KSC, Vandenberg SFB, and so on).  There was a quote going around that Musk had said he had hoped it wouldn't be needed because a water deluge wasn't doable on Mars and I think the trench didn't seem likely, either.  I think the reasons are more mundane.  Starbase Boca Chica is in the middle of miles of federally-controlled wetlands.  The water table is very close to the surface, and any water collected probably would need to be purified in some way, approved by the EPA or both. 

I may be totally off base here, but it seems to me that at Boca Chica they have the boosters and ships for the next few missions queued up.  They will need testing and won't be able to get tested.  The Starship pad and facilities at the Kennedy Space Center are a lot closer to being able to support new tests than Boca Chica, and will be for months.   Another deluge system to add to the wetlands on Cape Canaveral doesn't sound anywhere near as threatening, specifically because it will be "another" water deluge or flame trench, rather than the only one within 500 miles.  They should move those next couple of Starships over here for testing, even to launch the next Starship. 



Wednesday, July 27, 2022

About That Kamala Harris Quote

Every news site has posted about that quote from Kamala Harris yesterday.   You know, 

'My Pronouns Are She And Her, And I Am A Woman Sitting At The Table Wearing A Blue Suit.'

When I saw it, my first reaction was, "the table's wearing a blue suit??"  

As a sort-of writer-dude, that's what we call a dangling modifier.  The modifier after the word table is more associated with the closest noun, table, not woman.  Sitting is OK where it is, it could be before or after Woman, although saying 'A Sitting Woman At The Table Wearing A Blue Suit' is arguably worse.  

That's all.  Just wanted to spread this idea virus.
 


Friday, February 11, 2022

Our Annual Pilgrimage to Orlando

I guess I shouldn't call it an annual pilgrimage since it wasn't held last year; but that was because of 'rona, like 99% of everything else cancelled last year.  This weekend is the annual Orlando hamfest.  It was our 40th annual visit to the hamfest, and like every year since I retired, we went over today rather than the most crowded day (Saturdays).  It has been cool here, but warmed into the mid '70s as the day went by; I wore a short-sleeved fishing shirt and was comfortable all day.  By the time the temperature got into that "the sun is not your friend" range, clouds came along and kept it comfortable.

As I've said before the Orlando HamCation (real name) is now commonly referred to as the second largest in the world only behind Dayton's Hamvention (which is only Dayton in name - it's held in Xenia, Ohio).  Dayton tends to be the one where major products are announced.  Dayton, though, was cancelled both in '21 and '20, so while they're expecting to hold the Hamvention this year, they're out of practice. 

We were out of practice, too.  The last time we went to Orlando, we bought our tickets by mail.  In the past, we'd get an email that the show was coming and the way to get tickets was to send an SASE (Self-Addressed Stamped Envelope) and a check.  We'd send it around the Christmas-New Year's week and the tickets would be here within two weeks.  This year, we went looking for the email around Christmas and it wasn't there.  A check of the website showed that there was a new procedure.  We had to order the tickets online and pick them up at a special office at the east end of the property where the 'fest was held.

I admit to being uncomfortable with the routine, but it went well.  Parking is always packed at the HamCation and we were directed to a place just about as far from that office we needed to get to as one could be and still be on the property.  Thankfully, they had guys with oversized golf carts giving people lifts everywhere and one of them gave us a lift to that office.  They had our tickets and everything went without a hitch.  

Think of this as a stock photo, except I took it a few years ago. That's the north room of the Central Florida Fairgrounds where most of the smaller businesses and individuals rent tables, and the most obvious feature is the table full of used laptops.  The tables full of used laptops were back (although in different places). 

As I've said about other years, these are turning into uninteresting things, and that's a bit sad to say.   I rush to add that my interests in radio tend toward the unconventional, so it's not really surprising that I'd find the same 40 or 50 (or more) year old radios that I see every year not particularly interesting.  If you have a shopping list of things you need, they can be great places to get that special part.  

I did pick up one thing; there's a rather popular piece of test equipment called a NanoVNA**, a clever way of making a Vector Network Analyzer at previously impossibly low prices.  A VNA was always pretty much the most essential piece of test equipment I worked with since the first time I saw one, in about '86.  I've mentioned many times before that I frequently use an antenna analyzer for working on my antennas.  There are two issues with the one I have, neither of which has been insurmountable but were leading me to think of alternatives.  First is that my analyzer is obsolete and no longer available. Software updates have continued for it, but chances are pretty good that if anything happens to it, it's irreplaceable.  Second is that it only goes to the 2 meter ham band (well slightly higher - 160 MHz, I think).  An antenna analyzer is a one-port VNA; the NanoVNA is a two-port which means you can align or test filters or other circuits with an input and output connector.  Oh, and it's rated to around 10 times the frequency of the one port.  At the moment, the new NanoVNA overcomes both drawbacks of my AIM4170 and looks like a good path forward.

Other than that little purchase, running into friends and catching up with people whom we see yearly or less often ends up being what the hamfest is mostly about.  

02-23-22 at 1115 AM EST Edit to add this:

**  A comment from AndrewG says that the asterisked link is not official, and the official website is here at NanoVNA V2 Official Site.  I will note that the analyzer I bought does not look exactly like either VNA published on that second site, the connector position is very different, so I don't even know if it applies to what I bought.  Mine looks like the one on the site originally published above. 

Since I have nothing to conclusively show me that one site is more official than the other, I've added AndrewG's link here.  This may be relevant only to NanoVNAs claiming to be Version 2 (V2), which mine doesn't claim to be.  As always, and doubly always when dealing with Chinese clones, "caveat emptor" - buyer beware.



Monday, November 1, 2021

Weekly Update on the 1 by 1 - Part 12

As I mentioned yesterday, I've completed the crankshaft for the 1 by 1.  A little "pose for pictures" time.

Those counterweights, the first pieces I made, are just sitting where they'll be mounted.  I don't have any #5-40 hardware to mount them, but I do have a tap that I bought while building my Duclos flame eater engine so I tapped the holes as designed.  A smaller #4-40 screw goes into the hole, showing they line up.

Before this, I had to turn both sides to the proper diameter (rough turning here), cut to length and trim the rectangular sections of the crank to proper size (0.500 by 1.000).  I've come to call those rectangular pieces the crankshaft cheeks although they say the word can be webs, cheeks or arms.  Cutting to diameter and length were fiddly operations done slowly and gingerly, and then it was time to try to cut the major remaining feature, a keyway exactly on the top of the long side (left in the above shot).  

The tricky part was how to support the work and hold it so that it would take the cutting forces, while being perfectly parallel to the mill's table.  I first thought of just putting mill parallels (something like this) under the shaft while putting the base of the left crankshaft cheek on the reference surface of the vise.

That was a dopey idea.  The parallels don't hold position well enough and there's nothing resisting movement to the side from cutting forces.  After some thought, I decided to make a fixture that uses the exact dimensions of the cheek that would hold the shaft the same distance off the vise base as the one highlighted here.  This was an hour or so of work on a piece of scrap aluminum I had.  

The tool is on the left, and I made it so that the shaft either slides in from the end or snaps into place.  The setup was to put the new fixture on the left base of the vise and the left cheek on the right base.  Then I verify X, Y and Z are zeroed properly, and cut left to right.  I used a 1/16" wide end mill spinning as fast as my mill can spin it (~2200 RPM), but still only cutting at 1 Inch Per Minute (IPM) in three .018" deep passes. The keyway, though, needs to be 3/32 wide, which is 1/32 wider than 1/16, or 1/64 (.0156") on each side of the keyway.  So I moved the mill table 1/64 on both sides and cut two full vertical depth, .0156 off-the-side passes.  That didn't quite fit a 3/32 drill bit that I tried, so I moved both edges out another .0005" (.001" total width change) and that fit fine. 

The keyway is more visible in this view than the top picture. 

Once that was cut, it was pretty routine to tap the two #5-40 holes you can see, and it's done.  Actually, it's not quite done.  There's still some epoxy on the bearing surface that the piston rides on, from when I epoxied a piece into the gap opposite the journal bearing, between the crankshaft cheeks.  That's to keep the pressure from the lathe centering points from bending the shaft.  I think I can soak that in acetone for a while and then peel it off.

The crankshaft is bound for the finished parts box.  Lots of new things learned, one damaged (but recovering well) finger, and surprisingly little (zero) scrap.  There are 47 pdf files in the document package and it seems that that I've completed four of them.  By ordering a raw flywheel casting made of cast iron, I've eliminated at least one drawing but added things I'll need to either figure out separately, resurrect out of that eliminated drawing, or something.  

First, though, I need to give my big lathe a tuneup.  A few times while working this part, it seemed like it wasn't quite right at a few things.

Speaking of the damaged finger, I saw the surgeon today for a followup and she discharged me.  No followup needed - it's coming along as best as could be hoped for.  She said something like, "if you want, drop by in about a year and show us how it ended up."



Wednesday, August 4, 2021

Metal-Free, Completely Organic, Fully Biodegradable Batteries

Batteries that don't have metal electrodes, that are completely organic and fully biodegradable exist.  They're still somewhat of a laboratory curiosity in that I can't tell you a name that's on the market.  They're even worse at energy density than batteries that don't check all those squares in your game of Buzzword Bingo.  

I should point out that when they use the term organic, it's in sense that chemistry formally recognizes: it means that they're based on carbon compounds, not that they're grown on hippie farms.  As always, the common word biodegradable translates into normal-speak as "they will rot."

The article I'll refer to first appeared in the June Electronic Design magazine and focuses on work carried out by a team at Texas A&M University headed by Jodie Lutkenhaus, Professor of Chemical Engineering and Materials Science & Engineering.  In place of inorganic elements or compounds, like Lead and Sulfuric acid or Nickel and Cadmium terminals with a conducting paste, they created a battery using positively and negatively chargeable polypeptides.  Polypeptides are combinations of amino acids by what are referred to as peptide bonds.  The biggest and best known polypeptides are the proteins every living tissue is made from.  The battery polypeptides are only similar to those bigger proteins in the organic chemistry sense.


The process begins with an amino acid called L-Glutamic Acid (L meaning it rotates polarized light to the left; "levorotary").  L-Glutamic Acid is common in foods but not one of the "essential amino acids" that we can't synthesize and thus need to eat.  

Here I'll mercilessly grab part of the original article.  

In basic chemical terms, they started with l-glutamic acid polypeptide chains, then attached 2,2,6,6-tetramethyl-4-piperidine-1-oxyl (biTEMPO) to make the cathode and 4,4′-bipyridine derivatives (viologen) to make the anode (Fig. 2). A radical-based chemical mechanism “shuttled” electrons between the two structures.


Of course, as anyone doing research on batteries will tell you: a battery is more than just making this glop and pouring it somewhere, it has to be packaged properly, too. The packaging is shown in the Electronic Design article, but looks much like (well...) a battery.  Anode and cathode separated (by some filter paper in this case) and connected positive to anode and negative to cathode.  

The big question I had when I first saw this was how the energy density compared to other batteries, assuming it would be lower than existing batteries at this point in development.  

The storage density of this battery, with a terminal voltage between 1.1 and 1.6 V, is about 38 mA-hr/gm and 60 mW-hr/gm, which about one-third that of lithium-based sources. Furthermore, according to their detailed, fully referenced comparison table, it’s in the mid-range of “organic” cells that are non-degradable.

Unless I've gotten too out of practice at converting units, milliWatt*hour/gram are numerically the same as Watt*Hour/kilogram.  60 W*H/kg seems lower than the stated 1/3 of lithium batteries, but not terribly low.  I've read of electric car batteries doing over 400 W*H/kg and some claims of twice that being seen in some lab somewhere.  Gasoline offers 12,000 W*H/kg.

Given that, it's reasonable to ask "so what?  Why should I care about a low capacity battery that doesn't seem to offer any improvements?"  

The standard arguments against Lithium Ion batteries center on their not being recycled as much as people want (it costs too much), and that they use cobalt in their chemistries, a toxic metal that has become the target of human rights protesters - undoubtedly you've seen the pictures of children forced to work in the cobalt mines in horrible conditions.  Both of these objections are being raised in several places and everyone in the battery business is trying to come up with better solutions.    

 

 

Saturday, July 31, 2021

Weekend Shop Update on the 1 by 1 - part 3

"When we last left the story..."  I prepared a machining fixture, temporarily mounted the two chunks of metal that will become the side plates and said that tool paths were the next big step.   

As I started working on the tool paths, I saw an area that concerned me.  I planned to cut the part by waterline machining, which is parallel paths around the part as if the part is surrounded by water which is lowered a little bit at a time.  If the part is a simple rectangular or square box, this is simple enough to do by hand.  You just give the program the coordinates of start and stop points and tell it to go from one to the other, lowering the cutter every pass around it.  In a part with complex surfaces like this one, it either becomes a very involved program with dozens or hundreds of points you have to find, or you use Computer Aided Manufacturing (CAM) software, which is what I did. 

The program I'm using is an old version of DeskProto, version 5. I bought this software about a decade ago, and while it has been updated several times, they appear to be offering what I bought as a free version now, and you pay to add capabilities in the SW.  I need to look at the free version and see if it's better than what I have.  I have to arm wrestle DeskProto to get it to do what I want; the problem is even when I do, I don't get exactly what I want.  This is a screen capture showing the tool paths before I save them to a file.  The green lines are what are called rapids, or rapid movements; G0 or G00 in Gcode; these are as fast as your machine can move.  The red lines are the regular movements with a controlled feed rate.


I end up editing the tool paths in a text editor to remove those loops around the raised center area; that top surface is Z=0 and that area is already flat.  Some of those paths would cut off my mounting bolts if I didn't do this.. Then I check it in GWizard Editor from CNCCookbook.com to ensure it's cutting right. There still appears to be wasted motions that I'd like it to not make, but since I'm not trying to save every second of machine time, I won't try to edit them out.

This made me concentrate on that little triangular area in the lower right.  That's a large corner that's getting cut away, and what the image doesn't show is that the waterline paths will cut a slot in the aluminum there.  Eventually an inch deep and the 1/2" width of the cutter I'm using.  That concerned me because the cooling system I'm using, a misting coolant called a FogBuster, isn't going to get into a deep slot and blow the chips out like flood cooling will.  I decided to cut away that corner manually.  To do that, I had to figure out where to start and stop along that angular path.  Enter the design program again.

The only thing here that wasn't done by eye and saying "that looks close enough" was to draw the circles the size of the cutting tool (0.500") and pick places to put them.  The reason points 2 and 3 are farther off the edge than 1 and 2 is that I tested the points I had and the cutter didn't go past the edge of the blank.  I drew the rectangle wrong, so I moved 2 and 3 further along the angled path.  Then I wrote a GCode file that moves the cutter in numerical order, 1 to 4 and back to 1 and does that loop over and over.  That will cut away most of that big piece of waste, the only part of the blank to cut away. 

It didn't take long to notice that the cuts didn't seem to be as deep as the Mach 3 display (DRO) was saying as it was cutting.  When the file was done, instead of being all the way through the 1" thick piece, it was cut about a half inch deep. The cutter had driven the rest of the way up into the collet. I thought I had tightened that as tight as always. Oh, well...

I repositioned the cutter (a 1/2" carbide, 4-flute end mill), tightened very tightly and started the cut again. This time, it cut farther down, but still left a sizable ledge on the work - maybe .050 thick. I trimmed that back but every time I cut another pass, it didn't seem to cut any more of the edge away.  

Since the cut had pretty much achieved its purpose of trimming away most of that corner, I said it was close enough to done and decided to do the actual cut. I re-zeroed the cutter in the collet yet again and loaded the big Gcode file.  This file also left a thick ledge again.  You can see it in the red highlighted area, especially on the left.  That area on the right that looks thin with an irregular edge was from the cut to remove the metal in that area.

At this point, I took the carbide cutter out and replaced it with one of my older High Speed Steel (HSS) cutters that I had used several times before.  I suspected that the first cutter might be too small in diameter and that's why the collet couldn't grab it securely enough.  It's a cutter I got from some dood's table at Cabin Fever in '15, so maybe it was surplus because it was imperfect?  My mistake in retrospect was that I never stopped to analyze the problem and didn't really ask, "why is this a problem now and never has been before?"

I did the same exact file with the HSS cutter, spent about 10 minutes cutting air before it got to the bottom and it also left part of bottom too thick. By this time, it was late enough to shut down in the shop and I said I'd look closer at the cutter and collet today.

The cutter diameter was fine. The carbide cutter measured 0.4995 to my manual micrometer while the HSS cutter measured 0.4985. The diameter clearly wasn't the issue, so I cleaned out the collet with a paper "shop towel" (the blue paper kind) and some mineral spirits.  I don't know how it got oil in there, and I didn't see anything on the paper towel, but I put the carbide cutter back in the collet and did the last couple of passes around the side plate (I edited the file to remove everything above cutting to -0.950). This time, it left a thinner margin on the very left side of the blank, but it still had a visibly thicker area.  I re-checked the Z-axis and the cutter hadn't moved, so that meant the work must have moved due to the cutting forces. I lowered the last cut from the value the CAM set (-1.001) down to -1.004 and ran it again, this time resulting in a proper looking side plate.   I think the reason that previous try left some material on the left side is I inadvertently didn't position a backing plate under the left edge.

The end result of the trials.  There's a little metal around the bottom edge - or there appears to be some.  I think a little deburring will take care of that. On the table like this, there aren't many dimensions I can check but they all check to within about .002"with a tolerance of .005".  There's lots of adventures ahead with these two pieces; for starters I need to trim off the corresponding on the other side plate (visible at the right edge of the picture) and then do the big file of cuts on it.  That's just barely getting started.



Saturday, July 10, 2021

Shop Update on the 1 by 1

Last Sunday evening, I posted on the engine I'm starting on (the 1 by 1) and in particular, a moderately complex little part that I need two of, the crankshaft counterweights.  It's an odd geometry with almost every dimension defined by the outlines of three different circles; there are only three straight lines in the design, not counting one drilled hole. 

I thought I'd be able to get it done in three setups, while doing it on a rotary table on the mill (the way the designer made his) would take seven setups.  I optimistically said I should be able to get it done Sunday.  Hah!  

I completed them today, and it's on to picking the next part to do and starting that.  

I saw a way to cut out the outlines of both parts from one piece of steel which allowed me to do both parts with the same fixture.  My tool path was designed around using a 3/8" end mill to cut the outline, so by using CAD, I could see how far apart to mount the two parts so that I could cut two in succession.  It wasn't until Wednesday that I could start the cutting.  Between Sunday and Monday, I cut the 6" long by 1-7/8" wide strip of steel from a larger piece then cut it to size and had to reduce it's thickness from 3/8" to 5/16", by taking about .032 off each side.  Except having been messed up by using single cuts and not being a job shop that has to do each piece in the minimum possible time, I took smaller cuts and did more of them.  

This shows the two pieces right after cutting them out.  I like to say it came out almost as if I knew what I was doing.  It was kind of cool watching the cutter cut the one on the right out of the steel without touching the one on the left.

Look between the two of them where the piece of stock that hasn't been cut away has a point that's pointing out of the screen.  See the ledge between the left and right pieces?  It's an arc from that point to the right side of the left counterweight.  What you're seeing is the left one isn't cut to full depth while the right one cut through the steel into my scrap aluminum backing piece in places.  The backing piece is visible on the front left.

I ran into a couple of oddities with the one on the left. The first was that my CAM file thought it was done after cutting down .300 and not full thickness (.312).  I would have sworn that went to the full depth.  It was easy to extract one of the paths around the outline and run that as a separate file, just cutting a little lower by .005 then .010.  Then I rechecked my Z axis and found it was way off - like around .025".  I re-zeroed Z, and added the final trip around the part to the CAM toolpath file to get it to cut the full 0.312 depth.  Then I moved it 2" over to the right to cut the second one

All that irregular depth of cut meant was that when I took them off that fixture they're on, I had to do some file work to make the problem child match the other one.

Now we get to the real meat of this task.  How do I hold those rounded parts so that I can cut out the rectangular relief that goes under the mounting screw?  The vise, like most machinist's vises, doesn't have a flat bottom; it's more like two rails with a lower area between them.  That means I'd be resting rounded parts on an uneven, sorta-convex bottom.  That ain't gonna work, so I thought how could I cut out a matching radius to put the parts in to hold them?  I thought about using the rest of the steel that I cut them out of, but that's the wrong radius.  That radius is 3/8" more than the part because of the cutter going around them cutting out the parts.

It suddenly occurred to me that I could print one.  Take my solid model of the counterweight, build a rectangular box and use my model to subtract that radius from one side of the box.  Make it wide enough to level on both rails in the vise.  An hour and 30 cents worth of filament later, I had a fixture.  The two parts squeezed together are .620 thick, and I made the plastic thinner - like about .575 - so that the jaws wouldn't just squeeze the plastic but would lock the parts in place.  

That left two tasks: make sure they're not tilted, and then get an accurate zero in X.  I have an angle gauge that reads to .05 degree, so I set the angle that way. 

Solving problems like this is one of the main triggers that got me to buy the printer.  Fixturing and work holding are just about the most important aspects of milling and good fixtures can save tons of effort.

Once I cut the rectangular cutout, the printed fixture was a perfect way to hold the two parts to drill the through hole in the parts.  Being backed by plastic and not my vise made it risk free to the vise so a no-brainer to do.  They're not technically done in this picture, there was one more step, but they're pretty close to being done.  

This is after the second setup of the three needed, with the two counterweights alongside the fixture and the 3D printed test counterweight I did to make sure the dimensions were right after I translated from .pdf files to a CAD drawing. 

Those through holes in the counterweights are from a 0.136" drill bit, so they seem to be sized to pass a #6 screw (I dropped a #6 Socket Head Cap Screw into one and it fit just fine).  Where the end of the through hole meets the top of the rounded top edge, the hole gets counterbored with a 1/4" end mill 0.444" deep.  Those holes are finished but don't show up well in a photo.

I'm not sure what the next part is.  I've never made a crankshaft like this one, and it's going to be quite a learning experience.  It's supposed to be cut from 0.50 x 1.00" inch blank, but nobody sells those.  Instead I got a 1-1/4" round bar that will have to be made into the rectangular block.  That could be it.



Friday, May 21, 2021

Blue Origin Auctioning First Seat on New Shepard

Recently, Blue Origin announced that they were going to auction off the first seat on their new program of rides for hire that would take passengers to 100 km, above the Kármán line and officially into space, and experience a period of weightlessness.  The current high bid in the auction for the first passenger seat on the New Shepard suborbital mission is $2.8 million.  Two days ago, it had just broke $2 million. 

That's for one seat, out of the six seats on the New Shepard.  That first launch is tentatively set for July 20.  Blue Origin has not said if any of the seats are already assigned, or if Jeff Bezos will be riding with the lucky bidders.  Ars Technica reports:

The unsealed online auction for this seat will continue until June 10. Then, on June 12, the company will hold a live online auction among verified bidders to finally sell the seat. The company said the winning bid amount will be donated to Blue Origin’s foundation, Club for the Future, to inspire future generations to pursue careers in STEM and help invent the future of life in space.

Beyond this auction, Blue Origin has not released pricing for New Shepard flights—either for individual tickets or for an entire mission. However, a well-placed source told Ars that the per-seat price would be "well north" of $500,000 and much closer to $1 million for the first several flights.

To be honest, when I saw they were going to auction seats, I assumed they didn't really know what to charge and did an auction to get an idea of what the first few were willing to pay.  To borrow a term from sales critters, so they don't "leave any money on the table."  I have no idea what those flights cost, so no idea of what the break even cost for a seat would be.   

The current bid above $2 million speaks to the demand for suborbital spaceflight — passengers on New Shepard will experience the thrill of a rocket launch and several minutes of weightlessness—as well as the cachet of flying early in the program.

With New Shepard, Blue Origin will be charging well above the original price, $250,000, that competitor Virgin Galactic charged for seats on its suborbital space plane. This may be partly because New Shepard will go above the Kármán line of 100 km, compared to about 80 km for Virgin Galactic.

It may also be partly because Virgin Galactic's Unity spacecraft isn't flying.  Another article on Ars Technica says Virgin Galactic is troubleshooting an EMI problem (Electromagnetic Interference) that caused the control computers to halt ignition of the engines on their last test flight.  A test flight is currently scheduled for tomorrow, May 22, pending weather and the usual stuff.  It's not likely Virgin Galactic will be flying paying customers until 2022. 



Meanwhile, since the flight of SN15 and talk about re-flying it "soon," operations at SpaceX Boca Chica have been focused on building infrastructure, and building the cranes that will build that infrastructure.  A structure called the Orbital Launch Integration Tower has been the emphasis.  It is currently one tower-like structure on a large concrete base.  A second section was brought to the launch pad area today to stack on top of section one, and there are at least two more sections over near the High Bay. 


The two big cranes have been built and the second (on the right - called Kong by the Lab Padre nerds) was cranked up to that position for the first time today. 

 

 

Friday, January 8, 2021

Things Are Moving

I just don't have any decent pictures to show what I'm doing.  Let me back up a minute.  

We started down the road of my building a dream shop for retirement in 2013 and broke ground on it in early 2014. As always, no one can predict the future with absolute accuracy so we had no idea that an early retirement offer would change my plans and have me retire after the addition was put on the house but long before the shop was done.  In '14, we had the addition put on the house, with the construction being finished in May and by the end of the year adding the big machines.  Long time readers might remember stories I posted as I converted my milling machine to CNC.

We've been adding household stuff into the room as well as adding tools and accessories all over the shop, but living with the original layout of the shop since the completion of the CNC conversion in 2016. 

As I'm wrapping up the project that has sucked so much time in the last 18 months (!?!), my little IC engine, I've noticed some things I did wrong in the shop layout that have started to annoy me.  I finally decided I wanted to change the layout in the shop, increase storage around the metal shop area, and eventually decided that it needed to be pretty seriously changed.  I had silly little issues like having to walk from the mill halfway through the shop to get a drill bit or a screw.  While I think that stuff about walking 10,000 steps a day is a meaningless number not based on anything, I especially don't want to do it in a couple of hours in the shop. 

The vision when I started was there were to be three shop areas.  One would be machine tools - lathes and mills (there are three and two respectively).  The second area would be for woodworking with a pair of woodworking benches, table saw, router table and hand tools.  The third area would be for reloading, cleaning and working on guns, plus working on fishing tackle, making lures and the very occasional fishing rod.  By necessity, it has morphed into the area where I do much of my battery testing.  (The necessity is that I have nowhere else to set up a computer and monitor.)

In intervening years, the limited woodworking I've done is to build a few sets of shelves that went into the reloading area, and the enclosure for the big milling machine.  There have been a couple of other things, but nothing major. 


The mill in its enclosure when I declared the CNC conversion done and started trying to make things with it.  In the bottom left corner of the picture you see a wooden bench top with a mouse pad on it. 

In the next day or so, the mill enclosure and that work bench, which is paired in an "L" with another bench just like it, will swap places.

Oh, and there's more geekiness to come.



Sunday, August 9, 2020

A Ham Radio Series 10 – Transmission Lines - Part 1

When I say transmission lines, most of you will think of coaxial cables, which are the most common and most popular form of transmission lines in use today.  Two points: first, they’re not the only kinds used in ham radio and in our shacks; second, transmission lines are also circuit elements widely used in radio frequency design.  Having said that, let me go back and start from the basics.  As always, this is to ensure we’re all on the same pages.  

Transmission lines are what we think of when we want to get a signal from one point to another in our shacks or around our yards to get to antennas.  Ideally, you’d want no loss of signal and you’d want perfect shielding to keep the signal from radiating minute amounts of power into other circuits.  The strong point of coaxial cables is that they’re good at both of these.  A diagram of a typical cable shows the important dimensions.


 
The loss in the cable is more dependent on the overall diameter than on the exact construction; for example, details like whether the "dielectric medium" (insulator) is Teflon or polyethylene.  Larger cables have less loss.  Loss goes up as frequency goes up in any cable.  The shielding efficiency of single shielded coaxial cables is on the order of 50 to 60 dB (1/100,000 to 1/1,000,000 of the signal escapes – which can still be a problem in sensitive systems).  In those cases, double shielded cables (for example, RG-214 vs. RG-213) or cables with solid copper jackets (sometimes called hard line) get more shielding, with the rigid (solid copper jacket) cables providing shielding 1 to 10 million times better; leakage in the 10-13 range. 

The impedance of the cable is set by the dimensions it’s built to, but ordinarily you won’t build coaxial cables, you’ll buy the cable.
 
Where epsilon r is the dielectric constant of the insulator, D is the inside diameter of the outer shield and d is the outside diameter of the inner conductor.

The other common type of transmission line is formed by two parallel conductors.  These are available in different impedances, and the impedance of a parallel conductor line is given by a very similar equation.
 
Note that 276 is 2 times the 138 in the coax equation.  This equation uses k for the epsilon r used in the coax equation. 
 
The most common parallel conductor line impedance is probably 300 ohms; that’s usually a plastic insulated ribbon with thicker ribs on the edges, each carrying one wire, and called twin-lead.  There’s a higher impedance line called ladder line, which is sometimes constructed as the name implies: two wires with stick-like insulators between them so that it resembles a ladder.  There are 450 and 600 ohm ladder lines, a couple of examples from DX Engineering.  
 
 
Coaxial cable is easier to run around and get through windows and walls, but parallel conductor lines can offer better impedance transformations and allow more broadband antennas.  Coaxial cable has a bend radius that needs to be respected, but I find that easy to live with in Real Life.  Parallel conductor lines generally offer lower loss than coax, as this graph from the ARRL handbook shows, but are said to be more affected by rain and water on the lines.  Pick a frequency along the horizontal axis and go vertically to the transmission line you’re using to find the attenuation (in dB/100 ft).  You’ll note that the lowest loss is in the open wire lines at the bottom.  Higher is worse on this graph.

Graph with notation on it from here. 

It might be worth pointing out that these are typical numbers and that if you’re going to buy a coaxial cable, it can be worth researching the exact part number from the manufacturer you’re buying from.  If you can know that.  They’ll often give a table of losses in dB/100ft, like the chart here, that they guarantee their cable for. 

Since the theme of coaxial cables is “easier to live with and work with,” it’s worth mentioning connectors.  Over the years, manufacturers have migrated from soldered-on connectors to those that are crimped on.  This is because crimped on connectors have gotten better over the years and generally offer higher quality (higher repeatability) in the assembled connectors.  Much as you hardly see soldered on power connectors anymore, and they’re virtually all crimped, the same trend is in the RF world.  My station is still exclusively soldered-on connectors, but if I was starting over, or anticipating doing a lot of cable replacement, I’d seriously look at buying crimp on coax connectors and a good crimping tool.  

There’s a world of “connector nerds” out there who are against the use of the so-called UHF connectors (PL-259 plugs and SO-239 sockets) and it’s true that if you apply that equation for the impedance of a coaxial cable to the dimensions of UHF connector you come with a lower impedance than 50 ohms (around 30, IIRC).  The argument, undeniably true, is that difference causes an impedance bump on the transmission line that decreases performance.
 
I think it's good to ask yourself if that matters.  My approach is to always think in terms of electrical length and how big the impedance bump is.  The length of a mated pair of UHF connectors is around 1.3 inches.  I’d like to make sure that’s under 1/20 wavelength – and 1/20 wave is admittedly arbitrary and probably because I can’t recall the last time I saw a bump that small that mattered.  The formula for the length of a quarter wave vertical, in feet, given f in MHz is 234/f; 1/20 wave is 1/5 of that, and since 1.3 inches is 0.1083 feet, that gives us
solving for f, we find f has to be 432 MHz before a mated UHF connector pair is 1/20 wavelength long.  I’ve long used UHF connectors through 6m (50-54 MHz) and virtually every commercial 2m (144-148 MHz) I’ve seen has a UHF connector on it.  Many commercial ham radios that cover the 420 to 450 MHz band also use UHF connectors.  I would prefer to have N connectors for 2m and up, but will accept UHF.  On 145 MHz, 1/20 wave is 3.87 inches, so 1.3 is just about 1/60 wave.  That’s a pretty small bump. 

While it's true the twin lead transmission line is trickier to work with than coaxial cable, there are some multi-band antennas, like a G5RV and several other doublet antennas, that pretty much require it. 


The antennas typically still require an antenna tuner, and tuners that will handle the twin lead are both harder to find and more expensive.  I've seen examples where people do a balun (balanced to unbalanced transformer) outdoors so that the twin lead is converted to coax and a single coaxial line comes into the house.  That may allow you to tune your multi-band doublet with a coaxial tuner inside the house.  It could give the best of both worlds of the twin lead where you need it and the ease of routing coax where you need that.  I've read of it being done, but never tried it.


 

Saturday, February 22, 2020

My First Post That Went “Viral”

As part of this 10th year, I'm going to take a clue from one of my role models, Borepatch, who has posted a few of his memorable posts from his first 10 years (for example). 

From September of 2010, On Germs, Weeds, Companies, Governments and Skunks.  This was the first post I can recall getting a great deal of attention, and it was a heady experience to get linked to by Doug Ross @ Journal.  I got links from more places than I recall and for years this was my most read post. 

At seven months short of 10 years old, I re-read it to see if I still thought it was worth standing by and I think it has held up well.  I still like it.  I find the wording a little awkward in places, but that happens with things I wrote 24 hours before.  Most of the links are broken and some of the references might seem obscure.


On Germs, Weeds, Companies, Governments and Skunks

Has it ever seemed like we, as a country, can't do anything anymore?  The country that built the Empire State building in a blink has a gaping hole where the World Trade Center used to be for 9 years?  The country that went to the moon from nothing in 10 years now takes 20 years just to decide if we want to?  There's a reason for that national arthritis that keeps us from moving: regulation and its bastard sibling litigation.  

Credit Borepatch with this long post.  This post last week got me thinking along these lines.

When I was but a newly hatched larval engineer at a major defense electronics contractor, a mentor systems engineer gave me a reprint of an article from Defense Electronics magazine for August 1979, by Norman Augustine, the CEO of Martin Marietta (now part of Lockheed - most of us call them Lock-Mart these days, your one-stop defense supermarket - watch for the flashing blue light special on cruise missiles…).  The article covered what's now called Augustine's Laws.  I see they are out in book form:  and some of them have been excerpted by Political Calculations blog, but the version I have has a mere 15 laws.

There's a lot of wisdom in here and it's worthwhile to see if the ensuing years have changed things much.  I don't have the space to go into everything, but a few of these are worth looking at.  The first law is "By the time of the tri-centennial, there will be more government workers in the United States than there are workers" based on the growth rate at that time.  I think he's a bit long on this; it'll be before 2076.  He goes on to say that the government will control all of the money in the US economy.  "This raises the interesting question of whether the last person employed in the private sector will have to support the entire nation's work force, or whether he or she will individually enjoy the full benefit of those residual funds not yet controlled by the government".  This raises the guardedly optimistic second law, "People working in the private sector should try to save money if at all feasible.  There remains a possibility it may someday be valuable again".  What a silly optimist: the Fed has had crosshairs and laser sights on the backs of savers for almost a hundred years!  He presents a wonderful comparison of a contract for muskets for the continental army in 1798 that was delivered in 1/3 more time than contracted, and a survey of military contracts from 1978 that were delivered, on average, in 1/3 more time than contracted.  Some things never change!

His most memorable law, and where I'm going with this, was "Systems of Regulations created as a management surrogate take on a life of their own and exhibit a growth history which closely parallels other living entities observed in nature".  He went on to show the number of pages in armed forces procurement regulation vs. time along with a curve of weed growth (from the journal "Weed Science"), and produced a graph any biology student will instantly recognize as the sigmoid growth curve of populations, also called the logistic function. 

A usual example is the common bacteria E. coli.  This species can divide and produce a new generation every 20 minutes; if conditions could remain optimum it would undergo geometric growth and produce a colony the size of the planet in 24 hours.  Because conditions can't remain optimum, it has a logistic growth curve, producing much smaller colonies.
The normalized logistic function.  Credit

In regulations, there is a price for this.  Although the legislators and regulators never consider this, every regulation consumes some amount of time and money to comply with.  The new Finance Reform bill has been estimated to required the development of 250-300 new regulations.  Every regulation slows down, hinders and costs every honest business real money.  Despite the widespread talk of corrupt CEOs and general lack of corporate ethics, I've been working in the manufacturing industry since the mid 1970s, and every company has had an active, if not aggressive, ethics compliance program with requirements for training and seminars every year.  There are exceptions but most companies do their best to be honest and law-abiding.  Government seems to think it's mere coincidence that countries with lower tax rates and lower regulation attract business, and they demonize companies for moving to countries where the environment is better. 

A simple way of determining if someone you talk to has any economic sense is to ask them about corporate taxes.  The economically ignorant (I'll be polite) will scream to tax the corporations.  Those with sense will tell you corporations are fictitious and can't pay tax.  Tax is part of the cost of doing business and therefore passed on to the buyer (the people calling for them to be taxed).  Corporations can collect taxes for the government (for which they are punished with more costs, not paid) but cannot generate them.  Every penny a company has comes from its customers.  In a global market where they compete with companies in cheaper environments, they are at a disadvantage. 

At least in our society, regulation often leads to litigation, and companies are sued regularly for offenses (real or imagined) against the environment or against people; possibly employees, possibly customers, possibly people in the communities they work in.  When special interest groups, like environmentalist or animal rights for example, don't get the laws they want passed, they litigate to prevent companies from doing their business.  For example, some of the most verdant farm land in the country, the central valley of California, is currently not being farmed because a group got the courts to stop the irrigation on the basis that it harms a minnow, despite considerable scientific disagreement that irrigation has anything at all to do with the minnow's population.  (Summary here)  The human impact in terms of unemployment and lack of food production, however, is undeniable. 

Regulation and litigation are sand in the gears of society.  Big, sharp, 40 grain silicon carbide abrasive particles that grind the gears and shafts away.   

They have the awful side effect of discouraging companies to grow and innovate.  Industries can die off because of the threat of litigation, or because the regulations make it simply too expensive for the industry to survive.  Sometimes this is deliberate: we just survived the EPA banning lead ammunition, something that could well kill off hunting and recreational shooting in the country.  The requested regulation was a back-door attempt to do something that can't be passed as a law.   

Sometimes killing an industry is an unforeseen side effect.  The woodworking tool industry is in crisis right now.  A few months ago, a lawsuit was won against Ryobi tools' parent company, for producing a "defective" table saw.  The plaintiff was awarded $1.5 million when he sued for $250,000.  The defect?  It did not include an expensive safety option that was invented around year 2000; (the modern tilt-arbor table saw was invented in 1939; the basic idea goes back to 1813).  In 2000, an inventor produced a technology called a Saw Stop that senses when flesh touches the blade and stops the blade in milliseconds.  In the process of stopping the saw as fast as it does, it destroys the saw blade, and possibly other parts of the saw.  The user still gets cut, but typically will require stitches instead of having a body part cut off.  He shopped this invention to the major tool makers and none of them agreed to license his invention.  Their major concern was that the idea was untested; they had no idea how durable it would be (contractors' tools live a rough life); they had no idea if it could be added to existing products (were they rugged enough to survive the abrupt energy dump that destroys the blade?), or how to roll it out across their product lines.  The inventor started his own company, and sells table saws with this feature.  

This suit will end the production of low-priced and bench top table saws, seriously impacting hobbyist woodworkers as well as the tool industry.  Professionals will buy the more expensive saws and raise their prices to you and me.  
 
I'm most familiar with the electronics industry, so let me give you a story from my world.  Most people have heard about Silicon Valley, which certainly was, and may even still be, the innovation capital of the world.  A typical scenario might be like this.  In satellite communications, there is a couple, of large companies who dominate the industry.  Like all large companies, they have a large set of policy and procedure manuals that show everything that must be done for any situation that comes up.  Perhaps a new market is perceived; the company must conduct a study to see if there's enough money to be made to pursue the market.  They must do a developmental budget, have decision agreement ("buy-in") from many levels of management, and so on.  Perhaps a previous customer had sued them over delivery of a product that they thought didn't meet the contract promises, for example, so they may require marketing surveys to understand just what the market wants. 

Somewhere in that company is an experienced engineer; typically someone with 5-15 years of experience.  They see the opportunity and realize their company is so slow that someone else is going to beat them to it, and decides to be that "someone".  Perhaps doing the design on their kitchen table, or over lunch breaks, they come up with a concept that they believe will create a sellable product, if not the "killer app" product.  At this point, he quits the company, often with a few friends, and they form a start-up company that gets to market first, wins a lot of market share, and completely skunks the former employer.  All of this by being free to make decisions, do what they think needs to be done, and usually by working 60 hours a week for a while. 

The big companies have those manuals of policies and procedures for a reason.  To borrow a saying, good decisions come from experience and experience comes from bad decisions.  The big company is so afraid of someone doing something wrong, they try to write procedures that will eliminate all chances of errors, which means they eliminate all independent thought from the day to day running of the company. 

Smart companies, however, are aware of this conflict between carrying out procedures and try to remain nimble enough to be competitive.  Fads such as the 1980's Japanese Management techniques (e.g., Quality Circles), and this decade's Lean Manufacturing (also out of Japan) sweep the industrial world regularly as managers strive to understand how to walk this balance. 

As another example, a large company might want to try and compete with a lower cost company that is trying to edge into their marketplace; for example, a Defense contractor making a GPS receiver might fear a commercial competitor's cost advantages.  They might want to change their entire approach to design of a product, taking more risk, instead of exceeding their requirements by large margins, they may try to just meet them.  Instead of a receiver that will work from deep winter in Antarctica to the worst of the Sahara, they decide to make one that would work for a day-hiker.  When they try to do it, the company's process manuals haunt them, and internal organizations, desperate to prove they are adding value, force the "low cost" program to adopt the same high-cost approaches they use in all of their products.  This destroys the attempt to lower the cost and ensures the failure of the program. 

Smart companies have addressed these problems by spinning off what are called "skunkworks".  The original skunk works (note it's two words, not one) was an offshoot of Lockheed, and their most proud achievement (at least, that they could speak about) was the SR-71 Blackbird.  A group of talented engineers went off in isolation from the rest of the company and created the fastest aircraft in the world, in record time, in the 1950s.  Skunkworks as a single word is the term used for such a group set aside by any company for a similar purpose.  This has been shown to be a successful technique, but note that the original company is still there, still working as an arthritic bureaucracy. 

SR-71 Production line at the Skunk Works

This is where we find ourselves as a nation.  

We are strangling in a bureaucracy with a Code of Federal Regulations that has grown like a bacterial culture.  A nation that was founded by a constitution that fills about 14 printed pages in today's technologies, passes financial reform bills that go over 2000 pages, health care bills that go almost 3000 pages, and more.   Each bill creates hundreds of new regulations, which are so poorly written they have to be refined by hundreds of court cases.  The court cases effectively create new law and new regulations.  Since congress is in session every year and passes at least one new law every year, the total number of laws and regulations increases without limit and everything eventually becomes illegal. 

What can we do?  We can't form a "skunkworks country" that can get around our laws and create a more mobile, productive society.  We only have one option: we have to create a national process, like industries do, to become more "lean, mean and low to the ground".  Get rid of superfluous laws.  We simply must reduce the size of the CFR and reduce the destruction caused by the regulation and litigation in our society.  To me, Tort Reform is absolutely essential.  A big part of the industrial lean activities is to study what policies need to be gotten rid of because "we've always done it that way".  The same should be done with the CFR. 

To be honest, there's more than one option.  The second option will result in blood in the streets, the deaths of thousands or even millions, and suffering on a colossal scale.  When companies don't handle their tendencies to be become too arthritic they go out of business.  The equivalent for the country is collapse, civil war and chaos.  Something to be avoided if at all possible.  Without reform, and without throwing out large chunks of regulations,  we are headed there.